Author Topic: VA: VA-28/267 graph connection?  (Read 2267 times)

0 Members and 1 Guest are viewing this topic.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 05:19:58 am
VA: VA-28/267 graph connection?
« on: September 15, 2024, 06:25:48 am »
Should we have a graph connection between the two highways?

Going WB on VA-267, exit 9B would fulfill the requirements to have a graph connection IMO.

VA-28:
We could probably get away moving the 'VA267' point in VA-28's file down to the overpass area to allow for a graph connection between the two routes.
Also, 'InnAve' could probably be recentered on it's interchange overpasses as well.

VA-267:
Would shift '9' closer to where the EB ramp cross over the mainline, and rename it as '9A'.
Would then place a '9B' at the VA-28 overpasses and sync it with VA-28's file.

This would probably be a good solution for how complex that interchange area is.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 06:25:01 pm
Re: VA: VA-28/267 graph connection?
« Reply #1 on: September 15, 2024, 11:11:39 am »
I think the 9A location settles that odd ramp from the Dulles Access Road to VA 267 WB so I am good with this solution.