Author Topic: VA: US 29 and US 250 Needed Points in Charlottesville  (Read 6270 times)

0 Members and 2 Guests are viewing this topic.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Yesterday at 10:44:11 pm
VA: US 29 and US 250 Needed Points in Charlottesville
« on: December 26, 2016, 10:19:34 pm »
US 250 needs a point at the McIntire Rd/John W. Warner Pkwy interchange in Charlottesville.  (and maybe should have one at Hydraulic Rd near US 29, US 29 does not have one at Hydraulic Rd either)

US 29 needs one for sure at SR 631/Rio Rd due to the new Grade-separated interchange there. 

FYI, I am unsure what is going on at the RedShoDr (other than being a typo for Red Stone Dr) point farther east on US 250.

Offline mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1227
  • Last Login:Yesterday at 10:27:42 pm
    • Co-curator Virginia Highways Project
Re: VA: US 29 and US 250 Needed Points in Charlottesville
« Reply #1 on: December 30, 2016, 03:30:56 pm »
I have added waypoints for US 250 at Hydraulic Rd (prominently posted to reach US 29 North) and the new Warner pkwy interchange.  I also added points for 3 other interchanges on the 250 bypass.  i moved the RedShoDr point back to SR 635.

I added Rio Rd, Hydraulic Rd, and one of the missing interchanges from US 250...

Thanks...