General note: GM has a leading zero for 1-digit-F and H roads. OSM only has the zero for H roads. We currently go with OSM. I'm not sure what's the best (google does not help much) but I tend to add the leading zero for F roads.
H01:Kan -> Kak for
Kakarbhitta, It's sometimes Ka
nkarbhitta on google (maps) but redirected to Kakarbhitta.
Add
http://www.openstreetmap.org/?lat=26.659766&lon=88.100696 for
DhulabariAdd a third wp for
Mechinagar (111,000 inhabitants and last city in front of the border) in-between.
H07 is off
F61 -> F61_N
Add wp for F61_S just west of F61_N
F62 is slightly off
Move H08 to the center of the roundabout
Replace Jhu by F56 wp just to the east? Or KhaRd if you don't trust OSM on the F road name
F54 is not confirmed by OSM nor GM -> DhuRd?
Add
http://www.openstreetmap.org/?lat=26.523851&lon=86.957109 for Bantabari
Move F3 to
http://www.openstreetmap.org/?lat=26.551689&lon=86.883059 ? This F3 branch looks more major and GM only indicates this branch as F03. Minimum, the wp should be moved to the mainline of H01.
Bak is off
F05 is off
F05 is only indicated on GM but not on OSM. Since there is another F5 to the west on OSM (and in HB) but not indicated on GM. The latter looks more major. I guess that GM is wrong? Rename to Kus for Kushaba?
F52 is off
Bad is bad, er, off
F107 is off
H06_S is off. OSM suggests a roundabout but it's not. The wp should be positioned at
http://www.openstreetmap.org/?lat=26.929208&lon=85.955146F116 is slightly off
F6 is off
+X719493 is off and should be replaced by a visible wp. Nijgadh has almost 20,000 inhabitants
F118 is off
+X740383 is off
Move H02_S to the center of the roundabout
Ama -> Aml for Amlekhganj
MadMarg -> I see the small Madan Marg street to the east but I'm not sure that it extends to H01. The major Hetauda - Phaparban Rd is also only indicated to the Madan Marg end only but it might be the better choice. The shops around have no street name. OSM indicates "Hetauda Industrial Area", the wp label could be HIA?
Replace KriRd by a wp for more mojor Golphintar to the east?
DeuKot is off
DeuKot is called Way to Dev Kot on OSM (looks self-made, GM has no street name) and the village is called Deukot on OSM and GM. I'd rename the label to Sim for Simpani
KhaGha is off
OldHwy -> OldEWHwy but do we need the wp at all? The other end of the road has no wp and it's not needed for shaping
MadiTho -> H17, see subsequently!
H05 is slightly off
Amar is off
Cho is off
Between Cho and F8: Some shaping points are off, and the road exceeds the limits
F8 is off
F130 is off
F9 is off
KhaCho -> KhaChok
Sem -> Tam
F135 is off
F10 is off
+X221729 is off
Add new F11_S wp
F11 -> F11_N
Pip is off
F138 is off
F15 is slightly off
Rih should be moved to Rih (to the west) or renamed to Pai for Paite
H11 is off
Bas -> Ban?
+X727764 is off
+X533368 is off
Bhu -> F16 as suggested by OSM?
+X718284 is off
Move Cha to a junction
F151 is off
Do we need +x0 and +x1?
Add a wp in the border village instead, the border crossing is called
Kanchanpur, so wp label Kan?
please add more wps for major towns
e.g.
http://www.openstreetmap.org/?lat=28.627822&lon=81.152540 for 76,000 people in Lamki Chuha
http://www.openstreetmap.org/?lat=27.645139&lon=84.128787 for 62,000 people in Kawasoti
http://www.openstreetmap.org/?lat=27.053603&lon=85.632125 for 67,000 people in Lalbandi
http://www.openstreetmap.org/?lat=26.659943&lon=87.697710 for 107,000 people in Damak
We could generally replace more shaping points by visible wps. I guess that OSM indicates more town names than back in
H17:Add another route from H01's MadiTho at
http://www.openstreetmap.org/?lat=27.671138&lon=84.435596 to
http://www.openstreetmap.org/?lat=27.418976&lon=84.451089 as indicated on OSM
H17Brg extends to
http://www.openstreetmap.org/?lat=27.190651&lon=84.726557 on Esri WorldImagery which has a cut here
Google Satellite has an extension and "almost" meets the OSM end of the line before. I guess we need to wait for updated maps though?
btw: You could have told me that I misread wikipedia. The road is
not yet completed: "57% of construction of the road has been completed until November 2020"