The replacement of the weight-restricted bridge that this truck route was for was completed on via the
PA Rapid Bridge Replacement Project (
JV-338) on 8/2/2017.
While this is enough for me to remove this route from the HB, I thought it was interesting that I could not find any signs anywhere in GSV or the PennDOT VideoLog. A part of me thought that I saw signs for this, but maybe I was just not thinking straight driving down US 322 EB heading home from the Salamanca meet in June.
It also makes my life easier as I do not have to recenter this route along the US 22/US 522 concurrency from Mt Union to Lewistown.
On the downside, it takes a clinched route away from 23 of us (including myself).