Author Topic: PA: PA 655 TRUCK (Belleville) Removal  (Read 5360 times)

0 Members and 1 Guest are viewing this topic.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 03:26:22 pm
PA: PA 655 TRUCK (Belleville) Removal
« on: October 23, 2018, 12:09:49 pm »
The replacement of the weight-restricted bridge that this truck route was for was completed on via the PA Rapid Bridge Replacement Project (JV-338) on 8/2/2017.

While this is enough for me to remove this route from the HB, I thought it was interesting that I could not find any signs anywhere in GSV or the PennDOT VideoLog.  A part of me thought that I saw signs for this, but maybe I was just not thinking straight driving down US 322 EB heading home from the Salamanca meet in June.

It also makes my life easier as I do not have to recenter this route along the US 22/US 522 concurrency from Mt Union to Lewistown.

On the downside, it takes a clinched route away from 23 of us (including myself).
« Last Edit: October 24, 2018, 01:50:20 am by Markkos1992 »

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1767
  • Last Login:Yesterday at 12:05:27 pm
Re: PA: PA 655 TRUCK (Belleville) Removal
« Reply #1 on: October 23, 2018, 03:23:02 pm »
I wonder how many of those 23 are like me, completely unaware of clinching that route before you brought it up.
Clinched:

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 03:26:22 pm