1. I would consider a shaping point between 21 and NY/CT as the line crosses US 6/US 202. (only one in NY)
2. I would consider a shaping point on west of Exit 3 as the line follows US 6 briefly. I would also consider a shaping or visible point on US 6/US 202 between 1 and 2 as the line goes south of I-84.
3. I would consider a shaping point on east of Exit 8 as the line follows US 6 briefly.
Not on the TM Blank tilesets though.
4. 19 could arguably be 18A.
Exit 19 matches the number for SB CT8, and it's positioned just about exactly at the gore. In the earliest days of "Clinched Interstate Mapping", the 1PPI rule wasn't as firmly established as now, and we had things like separate
8 &
9 points
on NY I-278.
If I were drafting CT/usai from scratch, I might be tempted to 1PPI
18A into existing
18 to the west. But OTOH, it serves the EB onramp from HighlandAve. And OK, more arguably the WB offramp too. Which is as part of 18 here.
I'll just go no-build & leave it in, and keep the existing label for the CT8 interchange.
5. It looks like the 23 point should be 22A.
Signed as 23 EB.6. It looks like the 24 point should be recentered. Also this whole area seems to be Exit 25.
Looks like the mainline was shifted southward here.
I'll give this a a closer look.US 5: It looks like the 56A point from I-84 should be added to US 5 for a graph connection here. Note that it may create a NMP with nearby PitSt.
PitSt is not in use. Simply replaced it.