Author Topic: NC: US 401 Point Changes (Fuquay-Varina to I-85)  (Read 3365 times)

0 Members and 1 Guest are viewing this topic.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3302
  • Last Login:Today at 04:12:48 pm
NC: US 401 Point Changes (Fuquay-Varina to I-85)
« on: February 09, 2020, 09:50:30 pm »
1. NC 55 could arguably be NC55_W.
2.  HodSt could easily be replaced with Air Park Rd or Banks Rd.
3.  GelDr should be replaced with Ten-Ten Rd.
4.  PeaSt looks like it should be relocated (affects US 70 and NC 50).
5.  WakeForRd looks like it should be relocated.
6.  I'd replace GreBarkDr as it is a dead end road, but it does not look easily doable.
7.  NC 56 could arguably be NC56_W.
8.  A point could be added at Fuller Rd (FulRd) to replace the nearby shaping point.
9.  A point could be added at Liner Town Rd (LinTownRd) to replace the nearby shaping point.
10.  MainSt could be MainSt_N.  (affects US 158 BUS (Warrenton))
11.  A point could be added at Ridgeway-Warrenton Rd (RidWarRd) to replace the nearby shaping point.  (affects US 158 BUS (Warrenton))
12.  BeaDamRd should be for Michael's Quarry Rd (MicQuaRd).  (affects US 1)
13. (For US 158 BUS (Warrenton))  NC58 should be NC58_S.
« Last Edit: February 09, 2020, 09:53:13 pm by Markkos1992 »

Offline mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1227
  • Last Login:Today at 04:10:32 pm
    • Co-curator Virginia Highways Project
Re: NC: US 401 Point Changes (Fuquay-Varina to I-85)
« Reply #1 on: February 14, 2020, 04:09:37 pm »
changes made and in the queue