Author Topic: NY: I-87/287 shaping point issue  (Read 3580 times)

0 Members and 2 Guests are viewing this topic.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 12:20:42 am
NY: I-87/287 shaping point issue
« on: May 19, 2020, 07:29:34 am »
The two shaping points @ the Tappan Zee Bridge are still on the old bridge alignment and need to be adjusted to the new bridges.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca