TDOT appear to be ready to open a realigned section of US 411 from TN 92 around the north side of the Bush's Baked Beans plant and back to the 2-lane. Most all of the new signage is up except in spots on the old route.
It looks like the soon-to-be-former US 411 south of the plant will be signed as US 411 Truck. The intersection of US 411 and TN 92 is tight and can't handle trucks once US 411 moves onto TN 92 from the old route to the new route. I attached