Author Topic: KY: KY 52 Realignment west of I-75 near Richmond  (Read 650 times)

0 Members and 1 Guest are viewing this topic.

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3314
  • Last Login:Today at 10:34:01 am
KY: KY 52 Realignment west of I-75 near Richmond
« on: December 02, 2024, 05:18:04 pm »
https://transportation.ky.gov/DistrictSeven/Pages/%E2%80%8BKY%2052%20Relocation.aspx

https://www.aaroads.com/forum/index.php?msg=2954446

Quote from: hbelkins link=msg=2954446 date=1733170427
Quote from: seicer link=msg=2951254 date=1731513482
Related, Google Maps now has the new KY 52 alignment shown (map).


Got confirmation that the new KY 52 alignment is now open, but I don't know if signage has been changed on I-75 or US 25/421 on the east side of Richmond.

I believe this is the project being referred to.
« Last Edit: December 03, 2024, 04:49:18 am by rickmastfan67 »

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1776
  • Last Login:Yesterday at 10:19:26 pm
Re: KY: KY 52 Realignment west of I-75 near Richmond
« Reply #1 on: December 02, 2024, 07:55:26 pm »
Thanks. Good to know it's open. I should be in the area this weekend and can check on the renumbering.
Clinched:

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2078
  • Gender: Male
  • Last Login:Yesterday at 11:44:49 pm
Re: KY: KY 52 Realignment west of I-75 near Richmond
« Reply #2 on: December 03, 2024, 04:49:53 am »
^ Just fixed the Google Maps URL code so it's clickable now. :)

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3314
  • Last Login:Today at 10:34:01 am
Re: KY: KY 52 Realignment west of I-75 near Richmond
« Reply #3 on: December 09, 2024, 10:44:18 am »
https://www.aaroads.com/forum/index.php?msg=2956306

Quote from: hbelkins link=msg=2956306 date=1733758845
Quote from: seicer link=msg=2951254 date=1731513482
Related, Google Maps now has the new KY 52 alignment shown (map).


Checked this out yesterday. Although the project was advertised as a relocation of KY 52, it is actually signed as a westward extension of KY 2872.

After seeing that, I drove to check out the new KY 55 bypass of Campbellsville. Although much of the "2+1" configuration of the Heartland Parkway (KY 555/KY 55 between the Bluegrass Parkway and Columbia) is either complete or under construction, the KY 55 bypass was built as only a two-lane route little room for widening into a "2+1" configuration.

Also, there have been roundabouts (grrr) installed at KY 55/KY 555/Business US 150 and KY 555/KY 528 in Springfield. It also appears that one will be installed at KY 555 and US 150 in conjunction with "2+1" widening.

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1776
  • Last Login:Yesterday at 10:19:26 pm
Clinched: