Author Topic: KY/AR: New I-169 and I-57!  (Read 24851 times)

0 Members and 4 Guests are viewing this topic.

Offline dfilpus

  • Full Member
  • ***
  • Posts: 154
  • Gender: Male
  • Last Login:Today at 03:30:20 pm
    • Filpus Roadgeek
Re: KY/AR: New I-169 and I-57!
« Reply #15 on: December 21, 2024, 09:21:56 am »
On Facebook, I-169 conversion is announced as complete, with a photo.
https://www.facebook.com/photo?fbid=963449285820651&set=a.218039577028296

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1814
  • Last Login:Yesterday at 08:43:15 pm
Re: KY/AR: New I-169 and I-57!
« Reply #16 on: December 24, 2024, 01:31:47 pm »
Thanks. I-169 added, along with an extension of I-69 per the same FB post and a December 20 KYTC release which confirms it extends to exit 0.

https://github.com/TravelMapping/HighwayData/pull/8021
Clinched:

Offline leshii

  • Newbie
  • *
  • Posts: 10
  • Last Login:January 29, 2025, 04:58:59 pm
Re: KY/AR: New I-169 and I-57!
« Reply #17 on: January 23, 2025, 12:10:29 pm »
I am assuming I-57 still isn't signed in the wild in Arkansas, right (not counting "future" signs)?

Offline TBKS1

  • Newbie
  • *
  • Posts: 20
  • Gender: Male
  • Last Login:Today at 01:11:39 am
Re: KY/AR: New I-169 and I-57!
« Reply #18 on: January 24, 2025, 07:47:54 pm »
I am assuming I-57 still isn't signed in the wild in Arkansas, right (not counting "future" signs)?

I literally live right off it, it's not signed yet. I remember when the "Future I-57" designation became official in late 2017, and "FUTURE I-57" shields weren't installed until February 2018. Biggest difference between adding those signs and the official designation, is replacing all of the BGSes and all of the individual US 67/167 shields, which could take weeks or months. I have no idea what the status of any future signs going up are, I haven't stopped by the ARDOT sign printing shop since its designation meeting, but I imagine they're in the process of working on it, it'll just take a while. I'll be one of the first people to know when it gets signed, and I'll let you guys know about it here (and on aaroads) once it's designated.

Offline TBKS1

  • Newbie
  • *
  • Posts: 20
  • Gender: Male
  • Last Login:Today at 01:11:39 am
Re: KY/AR: New I-169 and I-57!
« Reply #19 on: March 17, 2025, 04:28:55 pm »
17 March 2025

The first I-57 shields have officially gone up in Central Arkansas! I took this photo a few minutes ago.


Offline si404

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2127
  • Last Login:Today at 07:10:44 pm
Re: KY/AR: New I-169 and I-57!
« Reply #20 on: March 17, 2025, 04:37:33 pm »
Not replaced the 440 shield with a blue one though.

Offline TBKS1

  • Newbie
  • *
  • Posts: 20
  • Gender: Male
  • Last Login:Today at 01:11:39 am
Re: KY/AR: New I-169 and I-57!
« Reply #21 on: March 17, 2025, 04:54:05 pm »
Yeah the BGSs won't be replaced for quite a while, this was literally the first I-57 shield that was installed. I counted four of them when I was driving up and down the frontage road between McCain Boulevard (Exit 1) and Exit 6

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4475
  • Last Login:March 22, 2025, 09:14:19 am
  • I like C++
Re: KY/AR: New I-169 and I-57!
« Reply #22 on: March 18, 2025, 01:58:29 pm »
So, north of Exit 6:
* Confirmed, nothing yet?
* Just Don't know yet?
* Other?



Edit:
Arkansas is pushing to get I-57 signed from Little Rock to Walnut Ridge at least as soon as the Jacksonville reconstruction is completed in 2027.
Judging from this, the Jacksonville segment may be a while yet, and could potentially hold up signage north of there -- potentially even N of exit 6 itself.

With this in mind, should I just add I-57 up to exit 6 for now and extend it as more signage appears N of there?

For now, I'll catch up on the AARoads thread.
« Last Edit: March 18, 2025, 02:05:41 pm by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline si404

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2127
  • Last Login:Today at 07:10:44 pm
Re: KY/AR: New I-169 and I-57!
« Reply #23 on: March 18, 2025, 02:37:32 pm »
Supposedly, from AA Roads, the signage crew will be heading north to cover the existing freeway, signing it with trailblazer shields as one project.

Firstly you don't want to keep extending it.
Secondly no one's travels will be missing if you wait.

So I suggest waiting and seeing if that is true.

Offline TBKS1

  • Newbie
  • *
  • Posts: 20
  • Gender: Male
  • Last Login:Today at 01:11:39 am
Re: KY/AR: New I-169 and I-57!
« Reply #24 on: March 18, 2025, 03:10:11 pm »
So, north of Exit 6:
* Confirmed, nothing yet?
* Just Don't know yet?
* Other?



Edit:
Arkansas is pushing to get I-57 signed from Little Rock to Walnut Ridge at least as soon as the Jacksonville reconstruction is completed in 2027.
Judging from this, the Jacksonville segment may be a while yet, and could potentially hold up signage north of there -- potentially even N of exit 6 itself.

With this in mind, should I just add I-57 up to exit 6 for now and extend it as more signage appears N of there?

For now, I'll catch up on the AARoads thread.

Posted this on aaroads but it probably won't be signed in Jacksonville proper until after the construction is completed there, although it may be signed past exit 11. Again I won't be able to check this for almost three weeks as I'll be halfway across the country during that.

Offline si404

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2127
  • Last Login:Today at 07:10:44 pm
Re: KY/AR: New I-169 and I-57!
« Reply #25 on: March 29, 2025, 06:11:35 pm »
Some photos have appeared on AA roads showing I-57 signs between exits 21 and 29.

https://www.aaroads.com/forum/index.php?topic=21289.msg2975949;topicseen#new