Author Topic: usalamlr-June 6 2025 concurrency extension to ca.c line also  (Read 29 times)

0 Members and 1 Guest are viewing this topic.

Offline M3200

  • Newbie
  • *
  • Posts: 9
  • Last Login:Today at 05:50:29 pm
FYI - when L.A. Metro opened the gap in the K Line light rail route on June 6, 2025, the C Line opened a (short) concurrent extension also.  The western end of the ca.c line is now LAXMTC, which is one additional stop from AviCen.  I rode the C Line on that new segment today; the revised system map can be found at www.metro.net.  (C Line trains use a 'pocket track' between the two mains, just north of the LAXMTC station, to reverse direction). Thanks