The Blair bypass is new to me. Any idea if it would be signed as mainline 30 or Truck 30? OSM has a line drawn in, looks like it would connect to 75 but if mainline 30 is put on it "eastbound" 30 would tack northwest. Plus, westbound 30 would now have two lefts and one right vs. one left through Blair.
I'm putting off clinching my unvisited Nebraska counties until that four-lane 30 is totally done between Fremont and Columbus, but if that has an ambiguous date I'll have to wait a while longer.