Author Topic: Nebraska Outlook  (Read 36661 times)

0 Members and 2 Guests are viewing this topic.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Nebraska Outlook
« Reply #15 on: December 20, 2022, 09:21:59 am »
L55W:
Feel free to check it out if you want, but no need to on my account. I'm satisfied with the need to delete it.

US30:
There's updated GMSV at the west end now -- as of Aug/Sept, the EB bypass was still closed there so there's nothing to sign.
I bet this state of affairs will continue till the whole shebang opens, so I'll just go no-build on the FutHwy30 label, even if it's a bit suboptimal.



2023
6/30: US30, North Bend to Fremont
Summer: Fremont Southeast Beltway
End of 2023: Blair bypass

2024
May: NE2 Jamaica Ave & 82nd/84th interchanges
Spring: Scribner Bypass?
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline the_spui_ninja

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 804
  • Last Login:Today at 09:46:42 am
  • THE Western SD Highway Nut
Re: Nebraska Outlook
« Reply #16 on: December 20, 2022, 10:36:36 pm »
Cool. So I didn't end up going that way, ended up clinching NE 94 and then going down through Scribner on 275; the spring 2024 completion date lines up with what I saw on the ground on that project, the bypass is just one part of a larger four-laning effort from past West Point (where we met up with 275) to Hooper with concrete on the new lanes in some parts and other parts just dirt/gravel. They'll probably finish the new lanes next spring/summer, then tear up the old road and repave that by the following spring. Fremont SE bypass shows no further progress at the south end since like June or so, they must be working on other parts if it's going to open soon.

Also should add, there's still signage for the Fremont business loops (noticed a single sign apiece), wonder if they'll sign a 77 Bus when the bypass opens.

I'll check out the new Lincoln bypass either tomorrow or on 12/28, depending on weather. Will confirm what's in the HB and see if there's anything else notable.
« Last Edit: December 20, 2022, 10:59:09 pm by the_spui_ninja »
An adventure is only an inconvenience rightly considered. An inconvenience is only an adventure wrongly considered. - G.K. Chesterton

Offline the_spui_ninja

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 804
  • Last Login:Today at 09:46:42 am
  • THE Western SD Highway Nut
Re: Nebraska Outlook
« Reply #17 on: December 21, 2022, 10:47:15 pm »
Trip report over on AARoads: https://www.aaroads.com/forum/index.php?topic=32637.0

Pretty much everything is correct. As far as point names, the exits have different road names going each direction, since the bypass runs right along a section line offset (one of the few areas around here that I've seen within a county). I would recommend using JamaicaAve, 70thSt, and 84thSt since those are the roads going north into the populated area. Although, if JamaicaAve, 68thSt, and 82ndSt are used because they're on top on the signs that's fine too (82nd and 68th are rural roads that 90% of people wouldn't use). L55W is indeed gone, the one shield I remember was gone.
An adventure is only an inconvenience rightly considered. An inconvenience is only an adventure wrongly considered. - G.K. Chesterton

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Nebraska Outlook
« Reply #18 on: December 22, 2022, 09:12:46 pm »
My philosophy was, "use the lower number". Maybe that's what got those numbers listed on top on the BGSes too.

US30:
There's updated GMSV at the west end now -- as of Aug/Sept, the EB bypass was still closed there so there's nothing to sign.
I bet this state of affairs will continue till the whole shebang opens, so I'll just go no-build on the FutHwy30 label, even if it's a bit suboptimal.



2022
Fall: Tryon North

2023
6/30: US30, North Bend to Fremont
Summer: Fremont Southeast Beltway
Dec: Pender South Bridges
End of 2023: Blair bypass

2024
May: NE2 Jamaica Ave & 82nd/84th interchanges
Spring: Scribner Bypass?

2025
Hastings Southeast construction begins

When?
US30 realignment, Grand Island
« Last Edit: January 01, 2023, 05:21:20 pm by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Nebraska Outlook
« Reply #19 on: November 10, 2023, 07:07:48 am »
Done:
Tryon North
North Bend to Fremont / Fremont Southeast Beltway



2023
Dec: Pender South Bridges

2024
May: NE2 Jamaica Ave & 82nd/84th interchanges
Summer: Blair bypass
Spring: Scribner Bypass?

2025
Hastings Southeast construction begins

When?
US30 realignment, Grand Island
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1584
  • Last Login:Today at 08:59:58 am
    • Hot Springs and Highways pages
Re: Nebraska Outlook
« Reply #20 on: April 05, 2024, 01:53:31 am »

2024

Spring: Scribner Bypass?

I drove US 275 through the Scribner area earlier this week. All traffic in both directions of US 275 now uses the bypass around Scribner. Work is still in progress on twinning the two-lane segments of the bypass (most of it). But I think we could go ahead and reroute US 275 onto the bypass.

Offline the_spui_ninja

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 804
  • Last Login:Today at 09:46:42 am
  • THE Western SD Highway Nut
Re: Nebraska Outlook
« Reply #21 on: April 05, 2024, 09:46:57 am »

2024

Spring: Scribner Bypass?

I drove US 275 through the Scribner area earlier this week. All traffic in both directions of US 275 now uses the bypass around Scribner. Work is still in progress on twinning the two-lane segments of the bypass (most of it). But I think we could go ahead and reroute US 275 onto the bypass.

Ooh, I'll have to go that way the next time I go down to my in-laws!

2024
May: NE2 Jamaica Ave & 82nd/84th interchanges
Summer: Blair bypass

I'll try to check these out sometime this summer/fall.
An adventure is only an inconvenience rightly considered. An inconvenience is only an adventure wrongly considered. - G.K. Chesterton

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Nebraska Outlook
« Reply #22 on: June 21, 2024, 11:16:09 am »
Done:
L1E removal & Scribner bypass



2024
May: NE2 Jamaica Ave & 82nd/84th interchanges
Late July: Blair bypass

2025
Hastings Southeast construction begins

2026
June: Grand Island West

2028
Fall: Mark NE US77 OldCheRd closed

When?
US30 realignment, Grand Island
« Last Edit: June 23, 2024, 05:06:59 pm by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline Highway63

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 538
  • Gender: Female
  • Last Login:July 03, 2024, 01:59:15 am
Re: Nebraska Outlook
« Reply #23 on: July 02, 2024, 04:41:03 pm »
When?
US30 realignment, Grand Island
Maybe never, if the already-404'd page tells us anything.  ;)

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Nebraska Outlook
« Reply #24 on: July 03, 2024, 08:40:07 pm »
Oops. That's now listed under 2026 with a new link, Grand Island West. I should have removed that old link when posting the new one.



Done: #7503: NE2 Jamaica Ave & 82nd/84th interchanges
2024: Late July: Blair bypass
2025: Hastings Southeast construction begins
2026: June: Grand Island West
2028: Fall: Mark NE US77 OldCheRd closed
« Last Edit: July 03, 2024, 09:33:42 pm by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline the_spui_ninja

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 804
  • Last Login:Today at 09:46:42 am
  • THE Western SD Highway Nut
Re: Nebraska Outlook
« Reply #25 on: July 08, 2024, 06:51:46 pm »
2024: Late July: Blair bypass

Drove by this on Sunday, everything looks paved and on track for opening at the end of the month. Not sure if this will just be a city street (so points on US 30 and US 75) or a new route (L89B?), can't tell at this stage yet.
« Last Edit: July 09, 2024, 10:16:56 am by the_spui_ninja »
An adventure is only an inconvenience rightly considered. An inconvenience is only an adventure wrongly considered. - G.K. Chesterton

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Nebraska Outlook
« Reply #26 on: October 08, 2024, 10:38:48 pm »
https://dot.nebraska.gov/media/onlimljm/20240912-comm-blair.pdf
Blair Bypass opened Sept 12.
Holding off on adding points until I can confirm whether it is or is not a Link.
Watched a few news clips in hopes of seeing a sign; no luck.
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline the_spui_ninja

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 804
  • Last Login:Today at 09:46:42 am
  • THE Western SD Highway Nut
Re: Nebraska Outlook
« Reply #27 on: October 09, 2024, 02:27:45 pm »
https://dot.nebraska.gov/media/onlimljm/20240912-comm-blair.pdf
Blair Bypass opened Sept 12.
Holding off on adding points until I can confirm whether it is or is not a Link.
Watched a few news clips in hopes of seeing a sign; no luck.

I'll be down in the neighborhood at the end of October and can field-check.
An adventure is only an inconvenience rightly considered. An inconvenience is only an adventure wrongly considered. - G.K. Chesterton

Offline the_spui_ninja

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 804
  • Last Login:Today at 09:46:42 am
  • THE Western SD Highway Nut
Re: Nebraska Outlook
« Reply #28 on: October 25, 2024, 10:00:30 am »
https://dot.nebraska.gov/media/onlimljm/20240912-comm-blair.pdf
Blair Bypass opened Sept 12.
Holding off on adding points until I can confirm whether it is or is not a Link.
Watched a few news clips in hopes of seeing a sign; no luck.

I'll be down in the neighborhood at the end of October and can field-check.

Field-checked it yesterday, there is no signage for any route whatsoever that I could tell (which might be a reason nobody's using it). For now, I would recommend adding "HolRd" points to both US 75 and US 30, which could be upgraded to route points if signage appears months after construction (like S27E).
An adventure is only an inconvenience rightly considered. An inconvenience is only an adventure wrongly considered. - G.K. Chesterton

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Nebraska Outlook
« Reply #29 on: October 25, 2024, 11:19:48 am »
Done: #7845: Blair bypass
2025: Hastings Southeast construction begins
2026: June: Grand Island West
2028: Fall: Mark NE US77 OldCheRd closed
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca