Author Topic: Mexico construction  (Read 1094 times)

0 Members and 1 Guest are viewing this topic.

Offline neroute2

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 638
  • Last Login:October 21, 2020, 10:36:35 pm
Mexico construction
« on: September 12, 2019, 03:49:51 pm »
new freeways:
Atlixco-Huejotzingo
Autopista Atizapán-Atlacomulco
Autopista Cardel-Poza Rica (portions open?)
Autopista Cuapiaxtla-Cuacnopalan (portions open; no number on km posts but signs at both ends say 136D)
Autopista Eje Metropolitano
Autopista Jala-Puerto Vallarta (portions open as 70D)
Autopista Mitla-Tehuantepec (portions open as 190D)
Autopista Oaxaca-Puerto Escondido
Autopista Pirámides-Texcoco (portions open)
Autopista Tepic-Compostela
Autopista Toluca-Naucalpan
Autopista Tuxpan-Tampico
Libramiento Poniente de Acapulco
Libramiento Sur de Tuxtla Gutiérrez
Libramiento de Villahermosa (extension east of 180)
Macrotunel Acapulco (extension east of 200)
short connection at Palmillas, extending 47D to 45

federal highways:
200 Alcholoa bypass
200 Cacalutla bypass

unknown:
southwest from 187 at Francisco J. Santamaria
« Last Edit: April 16, 2020, 11:57:46 pm by neroute2 »