Author Topic: NC: US-29 minor issues  (Read 4002 times)

0 Members and 1 Guest are viewing this topic.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Yesterday at 11:00:40 pm
NC: US-29 minor issues
« on: November 16, 2019, 07:01:29 am »
Just randomly felt like checking out this highway and noticed a few issues that need to be corrected, like new interchanges, or missing ones.

I'll mention the label and any possible other highways that are multiplexed & would need to be updated too at the same time that aren't 100% obvious.

=====
.....
NC216_N -> needs a recenter
.....
I-485(9)
LitRockRd -> Either move and make alt label for JoshBirPkwy, or leave as-is since it's in use (affects US-74)
NEW -> JoshBirPkwy (brand new access road to the Charlotte International Airport, & now the direct link to I-85 Exit 32) (affects US-74)
BilGraPky -> This one is a little tricky, there is no intersection here. Perhaps points @ Boyer Street & Mulberry Church Road since they are the roads that connect it?  That and hide the label under the new Boyer Street point? (affects US-74)
NEW -> RemRd (direct connection down to I-77 Exit 8 ) (affects US-74)
US74_E
.....
US29Con -> I-85Con (needs to be recentered due to interchange reconfiguration and being renamed) (affects NC-49) (original label in-use)
NC49_E -> needs to be recentered due to intersection reconfiguration
.....
SpeBlvd -> BruSmiBlvd (original label in-use)
NEW -> GeoWLilPkwy (missing SPUI interchange)
US601_S
.....
NC3
Missing -> 1stSt (interchange)
LaneSt
.....
PeelRd -> *PeelRd (RxR crossing closed and/or could be deleted, as not in-use and replaced by CedSprRd)
NEW -> CedSprRd (just to the north, replaced Peel Rd with a bridge over the RR)
PeaOrcRd -> *PeaOrcRd (RxR crossing closed and/or could be deleted, as not in-use and replaced by CedSprRd)
US70/601_W -> US70/601
.....
NC150_Lin -> NC150_E (end of the multiplex with NC-150, and only affects US-29's file, plus 'NC150_E' isn't in use, see below.)
.....
GreSt -> needs recentered (affects US-70 & NC I-85 BL (Lexington, NC))
BudKanRd -> needs recentered (affects US-70 & NC I-85 BL (Lexington, NC))
.....
FaiRd -> needs recentered (affects US-70 & NC I-85 BL (Lexington, NC))
.....
I-40(223)
Missing -> FloSt or HooSt (depends on placement) (missing interchange and formerly was a full interchange, but SB ramps are no-more, but can see stubs on Sat imagery) (affects US-70, US-220 too)
LeeSt
MarSt
Missing -> SulSt (missing interchange) (affects US-70, US-220 too)
US70/220_E -> US70/220
.....
NC150_E -> NC150_Mon (completely separate from the multiplex with NC-150 farther south, plus the label isn't in-use, allowing for a safe change here to allow it to be reused in the proper location farther south, without needing an update entry)
.....
US158/14 -> needs recentered (affects US-158, NC-14, I-785FutRei)
« Last Edit: November 16, 2019, 07:04:50 am by rickmastfan67 »

Offline mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1227
  • Last Login:Today at 11:15:31 am
    • Co-curator Virginia Highways Project
Re: NC: US-29 minor issues
« Reply #1 on: November 22, 2019, 09:24:55 pm »
changes made and in the queue

Online Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3302
  • Last Login:Today at 12:22:19 pm
Re: NC: US-29 minor issues
« Reply #2 on: November 24, 2019, 07:35:47 am »
I'll make a new thread focusing on US 52 as I noticed a few possible revisions that seem to mostly involve that route while checking to make sure the points were synced.