Can someone throw a quick glance at NH 27's border hops between Bihar and West Bengal to advise on how to address the Disconnected Route errors?
I *think* I have it all correct in the .csvs, but I'm not certain.
So I had a look at the individual routes and their border points. Seems like you finessed some on Bihar routes, but didn't then copy the coordinates over onto the Bengali routes
The order given for the (
connected route) works fine, so there's nothing wrong with the csvs. But if you zoom in on several of the border points, you can see
the disconnectsThe western end (indbr.nh027,indwb.nh027sur,indbr.nh027ang,indwb.nh027kan) forms a working connected route, but almost everything after that everything is disconnected - the next 3 chopped routes (indbr.nh027sam,indwb.nh027cha,indbr.nh027kis) connect, but that's it, with everything else being near-miss points.
action points:
indbr.nh027sam
WB/BR - copy to indwb.nh027kan
indbr.nh027kis
BR/WB - copy to indwb.nh027pan
indbr.nh027pot
WB/BR - copy to indwb.nh027pan
BR/WB - copy to indwb.nh027isl
indbr.nh027isl
WB/BR - copy to indwb.nh027isl
BR/WB - copy to indwb.nh027ram
indbr.nh027ram
WB/BR - copy to indwb.nh027ram
BR/WB - copy to indwb.nh027