So, where exactly does this SR 17 Conn. go? All the way to US 80/SR 26? Or does it turn before that? Has SR 17 been truncated currently? What is the time table for all of these changes?
SR 17 was extended northeast along Jimmy DeLoach Parkway to SR 21 ALT at the Sonny Dixon Interchange joining both with SR 21/30 in Port Wentworth.
Can confirm that SR 17 is signed west from SR 21 ALT, as I drove it from SR 21/30 to I-95. The rest of Jimmy DeLoach Parkway was signed as SR 17 by May of this year, and on guide signs for I-95 in December 2020.
Have photos posted along Jimmy DeLoach Parkway westbound with SR 17 shields from May at
https://www.aaroads.com/guides/ga-021-alt/Just got home last night and have not copied the photos from yesterday off the SD Card yet showing the SR 17 signage at the Sonny Dixon Interchange.
SR 17 Connector in Bloomingdale was still signed as SR 17 in May of this year. It appears they are waiting for the Jimmy DeLoach Parkway extension to open to sign it. The project completion for that is listed as 10/31/21.