I spent last week away from my desktop and only really had the early afternoon yesterday to try and catch up so hadn't updated outside of the Ppolish ones. Wegenwiki has additionally been slow in reporting. It's more reliable.
Reunion is hard as it's basically half the road has moved, but the other half is in situ. The visible points are basically the same and so it's a case of "do I move the shaping points to the temporary layout". At the moment I'm tending to no build until both directions are on the viaduct over the ocean rather than the road directly under the cliffs.
I've not seen any Spain recently. Pakistan has bigger fish to fry right now than opening roads - namely reopening flooded roads. Philippines has a short bit I'm waiting for more infor on. Iran and India I'm not maintaining really (ditto Russia, China, etc) beyond necessary updates to active roads that come up in something like the Wegenwiki recent openings. Caucasus are (long overdue) getting an overhaul after I've done Serbia - which I put in front because of waiting for the war stuff to get sorted (now is, perhaps it jumps back ahead?).
BiH is a bit interesting - it's not the easiest (probably why it took Chris Z a couple of days to get it on Wegenwiki. Ditto the Polish S5 which, not only ought to be fully done by now, but has an arbitrary "this access controlled divided highway is still DK5 as the aren't quite done, but this almost identical one is S5 other than a few documents signed off).