US 220:
1. SR796 should be
SR676.
2. Consider replacing the shaping point near
SR655 with a visible point there. Maybe even go with two
SR655 points.
3. VA43 should be JamSt (James St) with the VA43 label moved to the correct northern end (replacing the nearby shaping point). Also consider replacing the other shaping point in this area with a visible point at
SR 615. (note there is already a SR615 label farther north)
4. Note that
this project could be a factor in some of the alignment between VA 43 and Clifton Forge (not enough for a declinch on my end in any way, I probably drove most if not all of it about a month ago).
5. I think ForkViewRd is best served at
ForkFarmRd.
6. MagAve should be
RivSt (Riverside St).
7. Is TukeLn a viable point?
US 220 BUS (Clifton Forge): It looks like VerSt should be VerSt_W.
VA 311: SR740 should be
SR912.
VA 91 BUS (Glade Spring):
Clarified via Washington County GIS:
1. MapSt should be MapSt_N.
2. CreRd should be CreDr.