Re: New Hampshire outlook / 10-Year Plan
« Reply #1 on: October 29, 2021, 10:17:57 am »
Not strictly TM-related, but I found I-93 widening through Concord and projects to widen and add AET on the Everett Tpk of interest...

The big one which I've been aware of previously and also impacts Vermont:  a new VT/NH 119 bridge is being built about a half mile downstream of the existing bridge.  I don't know of construction has begun yet, but I know it will by next summer because there's a 3-month closure of VT 142 at that time where the new bridge will tie in (which requires elevating 142). (EDIT:) I've found news articles that indicate the bridge will be completed in 2024.

Another big one:  construction of "Exit 4A" on I-93...a new interchange about a mile north of Exit 4.  Looks like construction in the 2022-23 timeframe.  Project website is inactive, but there's a project info page on NHDOT's website.

I did find 2 projects that might involve TM changes:  there are plans to rebuild the I-293 interchanges at Exit 6 and Exit 7.  Depending on which options they're going with, it might require changing points and possibly changes to NH 3A.  A while to wait though, as funding isn't identified for construction until 2027.

Also a potential realignment of the NH 107/NH 150 intersection but that one's even further out:  2030.

Potential reconfiguration of the US 202/NH 124/NH 137 intersection in 2023.
« Last Edit: October 29, 2021, 10:25:17 am by froggie »

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4445
  • Last Login:December 18, 2024, 03:48:52 pm
  • I like C++
Re: New Hampshire outlook / 10-Year Plan
« Reply #2 on: October 29, 2021, 07:25:52 pm »
Thanks for looking through all that!
Did you really wade through all 232 pages?
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline froggie

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 859
  • Last Login:Yesterday at 07:35:31 pm
Re: New Hampshire outlook / 10-Year Plan
« Reply #3 on: October 30, 2021, 10:44:03 am »
I skimmed through.  A chunk of it is district-level stuff that wouldn't affect TM.

Offline vdeane

  • Sr. Member
  • ****
  • Posts: 430
  • Gender: Female
  • Last Login:Yesterday at 10:55:05 pm
    • New York State Roads
Re: New Hampshire outlook / 10-Year Plan
« Reply #4 on: October 30, 2021, 05:22:18 pm »
Not strictly TM-related, but I found I-93 widening through Concord and projects to widen and add AET on the Everett Tpk of interest...
If exit 15 gets reconfigured as a trumpet, that will definitely be TM-related.  That's the US 202 mainline right there.
« Last Edit: October 30, 2021, 05:26:07 pm by vdeane »
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4445
  • Last Login:December 18, 2024, 03:48:52 pm
  • I like C++
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4445
  • Last Login:December 18, 2024, 03:48:52 pm
  • I like C++
Re: New Hampshire outlook / 10-Year Plan
« Reply #6 on: June 23, 2024, 04:22:49 pm »
2024
Oct 24: Exit 4A (schedule)
Oct Late Nov: NH119 CT River bridge
« Last Edit: October 08, 2024, 09:53:43 pm by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4445
  • Last Login:December 18, 2024, 03:48:52 pm
  • I like C++
Re: New Hampshire outlook / 10-Year Plan
« Reply #7 on: December 09, 2024, 02:40:44 pm »
Done: NH119 CT River bridge
When?: Exit 4A