Author Topic: PA: Removal of PA 252 ALT TRUCK (Newtown Square)?  (Read 3149 times)

0 Members and 1 Guest are viewing this topic.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3303
  • Last Login:Yesterday at 11:40:31 pm
« Last Edit: June 24, 2021, 01:32:54 pm by Markkos1992 »

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3303
  • Last Login:Yesterday at 11:40:31 pm
Re: PA: Removal of PA 252 ALT TRUCK (Newtown Square)?
« Reply #1 on: November 04, 2021, 10:38:47 am »
From https://www.penndot.gov/RegionalOffices/district-6/ConstructionsProjectsAndRoadwork/Pages/Route-252-over-Springton-Reservoir.aspx on November 4, 2021:

Quote
Traffic was switched to the new bridge structure in early November.

So bye to PA 252 ALT TRUCK (Newtown Square) as well.  The bridge itself is already not being shown on the Posted and Bonded Viewer.

EDIT:  Updated locally.

Done in https://github.com/TravelMapping/HighwayData/pull/5290
« Last Edit: November 04, 2021, 04:51:40 pm by Markkos1992 »