Author Topic: VA: VA 3, VA 33, VA 55, VA 202, VA 214, and VA 215 Point Concerns  (Read 2828 times)

0 Members and 1 Guest are viewing this topic.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 07:25:05 pm
VA 3:
1.   Consider replacing the shaping point west of FleChaRd with a visible point at this SR 603.
2.   Replace the shaping point southwest of VA 347 with a visible point at SR 659.
3.   Consider replacing the shaping points southeast of US 360 with visible points. (definitely the second one at what I think is SR 607)
4.   A point should be added at SR 1036 southeast of Kilmarnock as it is the south end of the route that trucks have to use to bypass VA 3 in Kilmarnock.  I did not see a true “VA 3 TRUCK” that should be added to the HB.

VA 33:
1.   LeiSt should be LeiSt_W. MosSt should be MosSt_S. (added 12/18/2021)
2.   Consider replacing the two shaping points east of VA3_E with visible points.
3.   Try to make the shaping point west of PocSt visible.

VA 55: CobbMouRd>-CobMouRd.

VA 202:
1.   Consider replacing the shaping point east of SR 612 with a visible point at Zion Church Rd.
2.   The VA 203 labels should be S and N instead of W and E.
3.   The shaping point southeast of VA203_E could be replaced with a visible point at SR 675.

VA 214:  Should a point be added for the entrance to Stratford Hall?

VA 215:  FitzWay>-FitWay.
« Last Edit: December 18, 2021, 04:53:13 am by Markkos1992 »

Offline mapmikey

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1227
  • Last Login:Today at 04:45:34 pm
    • Co-curator Virginia Highways Project
Re: VA: VA 3, VA 33, VA 55, VA 202, VA 214, and VA 215 Point Concerns
« Reply #1 on: January 02, 2022, 10:39:25 am »
changes made including extending VA 3 to its actual endpoint