Author Topic: FL 429 partly completed to north end  (Read 14035 times)

0 Members and 2 Guests are viewing this topic.

Offline neroute2

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1142
  • Last Login:Today at 02:53:46 pm

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 05:19:58 am
Re: FL 429 partly completed to north end
« Reply #1 on: October 29, 2022, 03:14:33 am »
Ok, from watching the video there, I can make out the following Exit #'s.

53 for International Parkway
54 for I-4

All that leaves is the exit number from where it shifts from the FL-46 corridor.  OSM says 52, but I'd like confirmation on that first before I make the update (could be posted as 51, who knows, but 52 would seem right).

Plus, wasn't even aware that they had opened the segment from Exit 50 to 52(51) before the connection from I-4.  You're slacking there NE2.  :P

Offline neroute2

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1142
  • Last Login:Today at 02:53:46 pm
Re: FL 429 partly completed to north end
« Reply #2 on: October 29, 2022, 11:46:57 am »
It's exit 52.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 05:19:58 am
Re: FL 429 partly completed to north end
« Reply #3 on: November 07, 2022, 08:43:09 pm »
Out of curiosity, have you been there yet to check it out NE2?  OSM is saying that I-4 @ FL-46 has now changed to 101D (at least SB/WB).  From what limited imagery I can see, it looks like this will be the case, as on SB I-4, the new FL-429 ramp is now 101C.  Just wanted to be sure on this before I made a change to the numbering in I-4's file of 101C -> 101D.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 05:19:58 am
Re: FL 429 partly completed to north end
« Reply #4 on: November 07, 2022, 09:18:32 pm »
Took the chance and cleaned up FL-417 as well, properly extending it's Southern end down to where the northern set of ramps for I-4 Exit 62 join/leave due to the milemarkers (couldn't file MM0, but did find 0.5 on both sides and it matches up with the gore location where 0 should be). This gains about .7 miles for FL-417, but isn't news worthy, as labeling doesn't change, just shifts location to the correct point instead of where the overpass of SB FL-417 is.

Also put in a closed point for the historical FL-408 'spr' interchange that's no more.  Since that was a freeway in-itself before it was removed.  I honestly should have had that closed point on FL-417 from the start.  Had a shaping point there that I converted to a visible point.

=====

Anyways, changes pushed (sans I-4 101C -> 101D till confirmed).
https://github.com/TravelMapping/HighwayData/pull/6130
« Last Edit: November 10, 2022, 07:27:23 pm by rickmastfan67 »

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 05:19:58 am
Re: FL 429 partly completed to north end
« Reply #5 on: November 10, 2022, 01:24:21 am »
Also put in a closed point for the historical FL-408 'spr' interchange that's no more.  Since that was a freeway in-itself before it was removed.  I honestly should have had that closed point on FL-417 from the start.  Had a shaping point there that I converted to a visible point.

Now that I think about it, I should have labeled that 'old' point as *33B instead of *OldFL408 on FL-417.  Fixed that just now since nobody's using it yet.

https://github.com/TravelMapping/HighwayData/pull/6135

Offline froggie

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 858
  • Last Login:Yesterday at 10:02:59 pm
Re: FL 429 partly completed to north end
« Reply #6 on: November 10, 2022, 05:11:17 pm »
I happened to pass through SB 4 this afternoon...but was in the middle of a tropical storm rainband so didn't notice the exit number...did notice the ramp is open though.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 05:19:58 am
Re: FL 429 partly completed to north end
« Reply #7 on: November 10, 2022, 07:33:49 pm »
I happened to pass through SB 4 this afternoon...but was in the middle of a tropical storm rainband so didn't notice the exit number...did notice the ramp is open though.

I know that the ramp for FL-429 is now 101C (streetview was recent enough to show it, but main BGS covered over, sans exit tab) & FL-417 is 101B on I-4.  Just have them both lumped together as 101B.

What I'm trying to make sure about, is the FL-46 exit #, as that was previously 101C.  OSM says it's now 101D, but I want to be sure before changing it, as it was still posted as 101C when StreetView was last there.  For all I know, FDOT could have made it now 102, which would have probably been the best thing to do in the first place.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 05:19:58 am
Re: FL 429 partly completed to north end
« Reply #8 on: February 05, 2023, 12:35:01 am »
(sans I-4 101C -> 101D till confirmed).

Anybody been there as of late to confirm what the new exit number is for FL-46 on I-4 yet?

Offline neroute2

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1142
  • Last Login:Today at 02:53:46 pm
Re: FL 429 partly completed to north end
« Reply #9 on: March 07, 2023, 01:38:07 am »
Today the new signs had the tab covered up.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 03:26:22 pm
Re: FL 429 partly completed to north end
« Reply #10 on: March 16, 2023, 06:45:59 am »
I saw what NE2 saw there on March 9th.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 05:19:58 am
Re: FL 429 partly completed to north end
« Reply #11 on: March 17, 2023, 07:27:53 am »
I saw what NE2 saw there on March 9th.

As in, new signs for FL-46's exit, correct?

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 03:26:22 pm
Re: FL 429 partly completed to north end
« Reply #12 on: March 17, 2023, 08:15:14 am »
I saw what NE2 saw there on March 9th.

As in, new signs for FL-46's exit, correct?

Yes, I saw the same tab covered up that NE2 was referring to.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 05:19:58 am
Re: FL 429 partly completed to north end
« Reply #13 on: March 17, 2023, 09:57:47 pm »
I saw what NE2 saw there on March 9th.

As in, new signs for FL-46's exit, correct?

Yes, I saw the same tab covered up that NE2 was referring to.

Alright.  Hopefully sooner or later we'll find out if it's either going to be 101D or 102 so I can update I-4's file with the new exit number, since we know it's not going to keep 101C already.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Today at 05:19:58 am
Re: FL 429 partly completed to north end
« Reply #14 on: March 17, 2023, 10:03:19 pm »
Never mind, 101D CONFIRMED.
https://goo.gl/maps/tDUtypwjviAFfQmj8

https://github.com/TravelMapping/HighwayData/pull/6496

With this, we can consider this thread fully finished. :)