Author Topic: QC: A-85Not/QC-115 transition  (Read 2976 times)

0 Members and 1 Guest are viewing this topic.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Yesterday at 11:42:03 pm
QC: A-85Not/QC-115 transition
« on: June 06, 2024, 07:12:18 am »
It honestly seems that the transition between the routes isn't @ Exit 47 any longer.  It seems like it's another ON-17/417 transition type of thing. lol.

There's currently a NB A-15 shield over 1km south of the end of the divided highway.

Now, there's no shields at the transition point from 4 to 2 lanes, but I assume that's where the official swap of the designations is currently.

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1584
  • Last Login:Today at 12:55:08 pm
    • Hot Springs and Highways pages
Re: QC: A-85Not/QC-115 transition
« Reply #1 on: June 06, 2024, 09:00:07 am »
It honestly seems that the transition between the routes isn't @ Exit 47 any longer.  It seems like it's another ON-17/417 transition type of thing. lol.

There's currently a NB A-15 shield over 1km south of the end of the divided highway.

Now, there's no shields at the transition point from 4 to 2 lanes, but I assume that's where the official swap of the designations is currently.

The A-85/QC 185 endpoints conform to our usual practice of using the last interchange as the endpoint. That is what we did with the north end of A-55/south end of QC 155.

Construction is underway on connecting the two A-85 segments and eliminating QC 185, planned to be complete in 2026. Even before the project is complete, A-85Not might get extended to a new interchange west of exit 47. Either will make this issue go away for A-85.

I would wait on A-85, and also leave A-55 alone.

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Yesterday at 11:42:03 pm
Re: QC: A-85Not/QC-115 transition
« Reply #2 on: June 06, 2024, 09:21:11 am »
It honestly seems that the transition between the routes isn't @ Exit 47 any longer.  It seems like it's another ON-17/417 transition type of thing. lol.

There's currently a NB A-15 shield over 1km south of the end of the divided highway.

Now, there's no shields at the transition point from 4 to 2 lanes, but I assume that's where the official swap of the designations is currently.

The A-85/QC 185 endpoints conform to our usual practice of using the last interchange as the endpoint. That is what we did with the north end of A-55/south end of QC 155.

Well, we recently extended I-40 past it's final exit due to it's End/Begin shield location in NC.

Also, if using the last interchange as the end point, we'd have lost almost 3 miles on ON-417 which is clearly signed as part of ON-417 before it transitions into ON-17.

Just wanted to point out these other examples.