Author Topic: NOR: E39 realignment Liaboen  (Read 1724 times)

0 Members and 1 Guest are viewing this topic.

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4730
  • Last Login:Today at 07:00:59 am
NOR: E39 realignment Liaboen
« on: June 08, 2024, 11:21:24 am »
A realignment is u/c between Fv65 and Fv6282. I saw a sign indicating "Høst 2024" = Fall 2024. While the site near Fv65 looked quite advanced, there is still a lot to do at east end. Opening by end of 2024 should be possible though.

https://travelmapping.net/hb/showroute.php?r=nor.e39tro&lat=63.112080&lon=8.423510&zoom=13