Author Topic: DEU-SN: Göltzschtal  (Read 1852 times)

0 Members and 2 Guests are viewing this topic.

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4758
  • Last Login:Today at 04:07:07 pm
DEU-SN: Göltzschtal
« on: August 24, 2024, 12:10:59 pm »
S298 will be truncated from S304 in Falkenstein to Auerbacher Straße in Remtengrün on 2024-08-30.
S304 will be extended from Falkenstein to B169 on 2024-08-30 when the new ramp to B169 will be opened.
S303 will be truncated from S304 in Falkenstein, and reextended to B169 on 2024-09-13 when the western bypass of Falkenstein will be opened.

https://www.recht-sachsen.de/downloadable/download/attachment/id/2433/

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4758
  • Last Login:Today at 04:07:07 pm
Re: DEU-SN: Göltzschtal
« Reply #1 on: September 03, 2024, 03:27:30 pm »