I swung by on Sunday to see if signage had changed, and it hasn't since Mark was there. Doesn't WVDOT have a schematic or something for the project that shows the endpoints?
I am still checking whenever in the area and have seen nothing. That Sheetz has become a regular stop for me at the east end.