There's currently an interchange under construction along the FL Turnpike between Exits 35 (US-27) & 39 (I-75) @ NW 170th Street. No idea when it will be opening, but wanted to make this thread so if somebody spotted it being opened, they could let me know about it.
Already had a 'shaping' point in that area, so I have already adjusted it to the location of the future interchange. All I would have to do is just rename it to whatever exit number they give it.