Hmm, based on the exit numbers & looking at OSM, we'll also need to have three separate 'Exit 41's'. Mainly because US-52 will keep an Exit 118, that I-74 will have almost 0 access too. Kinda similar to I-40 (1F) & I-240 (32) in Memphis. That or I-90 & the northern end of US-219 in Buffalo NY as another example.
This is because I-74 will have the inner lanes thru US-52's Exit 118. It does seem there will be a direct on-ramp from NC-65 to I-74 EB that's separate from the US-52 one. So, maybe we'll have to have a separate point for NC-65 in I-74's file as '
41B'.
This new 'split' point for 41 (& give the big interchange 41A), would be best suited here (
current US-52 Exit 119):
41
http://www.openstreetmap.org/?lat=36.216839&lon=-80.308750And of course, one of the two routes will need to have the 'extra' shaping points between all 3 exits to prevent the false-multiplex right there, while maintaining the graph connections.
Of course, this can be done once we know that the rest of the new numbers (& I-74 shields) are up.