Just pointing out that there's zero US85 or US87, on 2023 GMSV, around Walsenburg where the US highways take I-25BL rather than I-25.
I don't believe that means any change, just pointing out that there's no signs saying it takes the business loop (though there's no signs saying it's on the Interstate).