Author Topic: MB: MB 3ACle now 2 segments  (Read 128 times)

0 Members and 1 Guest are viewing this topic.

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1842
  • Last Login:May 17, 2025, 12:07:34 am
MB: MB 3ACle now 2 segments
« on: May 04, 2025, 09:58:50 am »
https://www.mhs.mb.ca/docs/sites/clearwaterbridge.shtml

Looks like MB 3A (Clearwater) should be split into 2 segments at the site of the former bridge, which was removed in 2018 and evidently won't be replaced.
« Last Edit: May 04, 2025, 10:02:42 am by mapcat »
Clinched: