This is partially a note to myself for the future.
MnDOT is currently undertaking a
grade separation project in Moorhead, building underpasses under two BNSF mainlines (the Prosper and KO Subdivisions) along 11th St. I have been informed by MnDOT that they intend to relocate US 10/75 between 8th St/Main Ave (the western 10/75 junction) and 11th St/Central Ave to utilize one of the underpasses and remove the routes from the existing at-grade rail crossing at 8th St.
As currently scheduled, the project wraps up in late 2026.