OR 211: Recenter northern point with OR 224 to OR 224's location. Point needed with Eagle Creek Road needed (for Clinching via TriMet's line 30 Estacada).
Note: Barlow Trail will need this as well, as it's pegged to 211 here instead of 224. Point also needed with Eagle Creek Road just east of OR 224.
Suggested point with Barton County Park on Baker's Ferry Road just south of OR 224.
OR 35: Points needed at both ends of FS 3531 to match the Barlow Trail's brief diversion from OR 35 just east of US 26.
Note: Barlow Trail apparently has two points at the US 26/OR 35 interchange, one for each route. That should be collapsed into one point.
OR 206: Point with I-84/US30 at western terminus needs recentering. Point with the Frontage Road needed as well.
Point with Clark Street in Wasco needs to be recentered. Add a point to the south where the route leaves Clark Street. Point needed at Klondike Lane. Point between Sandon Road and Hay Canyon Road needs to be 'exploded' to both to match the Barlow Cutoff.
Note: Barlow Trail_Wasco will need points at both intersections with Clark Street -- north of OR 206, and the one with OR 206.