Author Topic: Project Statistics  (Read 269600 times)

0 Members and 2 Guests are viewing this topic.

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1770
  • Last Login:Yesterday at 08:05:40 pm
Re: Project Statistics
« Reply #30 on: July 04, 2016, 11:38:16 pm »
Nice! Any goals in mind for end-of-year?
Clinched:

Offline Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2856
  • Last Login:Today at 08:50:39 am
Re: Project Statistics
« Reply #31 on: July 31, 2016, 12:20:13 am »
We've had some new users submit list files this week, bringing us to 136 list files loaded into the update currently in progress.  Over 100 of those have been created or updated in the last 6 months, so I'd consider most to be active users.

Over 24,000 .wpt files are now processed as part of a site update.

The SQL file that repopulates the database on each site update is now over 4,000,000 lines long.

Offline Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2856
  • Last Login:Today at 08:50:39 am
Re: Project Statistics
« Reply #32 on: August 08, 2016, 12:12:23 pm »
For a paper I'm writing about the graphs I generate from the TM data, I wanted to see the distribution of edge lengths in the "tm-master.tmg" graph.  I thought an exponential distribution would be most useful.  Units are miles:

Code: [Select]
Edge length distribution (exponential):
0.0 <= len < 0.125: 4308
0.125 <= len < 0.25: 9289
0.25 <= len < 0.5: 23572
0.5 <= len < 1.0: 50177
1.0 <= len < 2.0: 73762
2.0 <= len < 4.0: 71648
4.0 <= len < 8.0: 47886
8.0 <= len < 16.0: 11255
16.0 <= len < 32.0: 1760
32.0 <= len < 64.0: 333
64.0 <= len < 128.0: 44
128.0 <= len < 256.0: 6

This is the graph that has hidden waypoints collapsed, so the lengths are essentially lengths between visible points in our .wpt files.

I was a bit surprised that we had 50 places where it's over 64 miles between visible points.  Here they are:

Code: [Select]
E123/AH62@ImeKom to E123/AH62@Syu via E123,AH62 length 211.0824
AH4@Qah to AH4@X208 via AH4 length 150.6198
AH42@ChaRd to AH42@YiLoc via AH42 length 150.4283
AH32@BayNuur to AH32@A22_W via AH32 length 148.6031
AH42@S308 to AH42@Tan via AH42 length 142.8158
E003@Min to E003@R180_W via E003 length 131.0283
E003@Bar to E003@Dar via E003 length 113.3032
AH32@Bay_W to AH32@BayOvoo via AH32 length 109.4872
G0613@Yen to G0613@G214_Zhe via G0613 length 107.4038
AH2@Dal_E to AH2@AhmWal via AH2 length 106.5611
BC97@BucRivPP to BC97@Rd254 via BC97 length 105.9764
G3011/AH42 to AH42@S308 via AH42 length 102.0576
AH78@Rav_N to AH78@Nay via AH78 length 102.0325
AH2@Fah to AH2@Nos via AH2 length 97.6226
AH32@Urg to AH32@Durv via AH32 length 91.2911
G50@S233 to G50@G318_Lib via G50 length 91.0735
AH3@Ula to AH3@Urg via AH3 length 90.5063
AH75@R92_E to AH75@Kha via AH75 length 88.5040
AH70@R36_E to AH70@Jan via AH70 length 87.5963
AH32@G45/G1202&G12@G45/G1202&G45@G12/G1202&G1202@G12/G45 to G45@X147 via G45 length 84.8840
AH4@Tol_E to AH4@A17&AH32@A3 via AH4 length 84.4882
E40Nuk/AH63@Jas to E40Nuk@Kar&AH63@Kar_W via E40Nuk,AH63 length 84.4761
BC97/BC97Con@BC/YT to BC97@LiaRivPP via BC97 length 82.3130
G65_S/G78_E to AH1@G65_N&G65@G80_E&G80@G65_N via G65 length 78.7951
AH32@Durv to AH32@Ald via AH32 length 77.1011
AH1@AFG/IRN to AH1@JamiRd via AH1 length 76.7270
AH77@Awb to AH77@Puni via AH77 length 76.1823
AH2@Taf to AH2@NokKun via AH2 length 75.2716
AH4@Tas|CHN-XJ to AH4@CHN/PAK via AH4 length 74.9304
AH4@Alt to AH4@Ton via AH4 length 74.4814
AH3@Air to AH3@Sai_N via AH3 length 73.6239
AH51@Dar to AH51@ZhobWanaRd via AH51 length 73.4893
G5012@S2/S20 to G65/G5012 via G5012 length 72.1187
G56_E/G76_E to G56(621)/G4215 via G56 length 72.0961
BC37@NinPP to BC37/BC37A via BC37 length 72.0237
AH42@GonExpy&G6Hai@G0613&G0613@G6 to AH42/G6Hai@G109_Das via AH42,G6Hai length 71.5764
AH1@FarRd to AH1/AH71 via AH1 length 71.0943
G35@HuaRd to G35/G72 via G35 length 70.5915
BC37@CasRd to BC37@BouSt via BC37 length 70.3705
AH70@R36_W to AH70@ToR44 via AH70 length 70.0952
AH6@X904 to AH6@Bay_W via AH6 length 69.4362
AH71@Kha_N to AH71@FarRd via AH71 length 69.2148
G42@S312_Wudu to G42@HB/CQ via G42 length 68.9330
E6Kir@Rv92_E&Rv92@E6_E to E6Kir@E75_S&E75@E6_W via E6Kir length 68.2212
AH2@NokKun to AH2@Yak via AH2 length 68.1582
G3012Yar@G315_YenS to G3012Yar@SanExpy via G3012Yar length 66.6719
M41@Karo to M41@Ran via M41 length 66.6389
NT3@ChanLakeTP to NT3@MosCrkTr via NT3 length 65.7823
AH2@R82_N&AH70@R82 to AH2@Anar_W&AH70@Anar via AH2,AH70 length 64.9629
NT1@WalCrkTr to NT1/NT3 via NT1 length 64.0154

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1584
  • Last Login:Today at 08:59:58 am
    • Hot Springs and Highways pages
Re: Project Statistics
« Reply #33 on: August 08, 2016, 02:55:47 pm »
I was a bit surprised that we had 50 places where it's over 64 miles between visible points.  Here they are:

Code: [Select]
E123/AH62@ImeKom to E123/AH62@Syu via E123,AH62 length 211.0824
AH4@Qah to AH4@X208 via AH4 length 150.6198
AH42@ChaRd to AH42@YiLoc via AH42 length 150.4283
AH32@BayNuur to AH32@A22_W via AH32 length 148.6031
AH42@S308 to AH42@Tan via AH42 length 142.8158
E003@Min to E003@R180_W via E003 length 131.0283
E003@Bar to E003@Dar via E003 length 113.3032
AH32@Bay_W to AH32@BayOvoo via AH32 length 109.4872
G0613@Yen to G0613@G214_Zhe via G0613 length 107.4038
AH2@Dal_E to AH2@AhmWal via AH2 length 106.5611
BC97@BucRivPP to BC97@Rd254 via BC97 length 105.9764
G3011/AH42 to AH42@S308 via AH42 length 102.0576
AH78@Rav_N to AH78@Nay via AH78 length 102.0325
AH2@Fah to AH2@Nos via AH2 length 97.6226
AH32@Urg to AH32@Durv via AH32 length 91.2911
G50@S233 to G50@G318_Lib via G50 length 91.0735
AH3@Ula to AH3@Urg via AH3 length 90.5063
AH75@R92_E to AH75@Kha via AH75 length 88.5040
AH70@R36_E to AH70@Jan via AH70 length 87.5963
AH32@G45/G1202&G12@G45/G1202&G45@G12/G1202&G1202@G12/G45 to G45@X147 via G45 length 84.8840
AH4@Tol_E to AH4@A17&AH32@A3 via AH4 length 84.4882
E40Nuk/AH63@Jas to E40Nuk@Kar&AH63@Kar_W via E40Nuk,AH63 length 84.4761
BC97/BC97Con@BC/YT to BC97@LiaRivPP via BC97 length 82.3130
G65_S/G78_E to AH1@G65_N&G65@G80_E&G80@G65_N via G65 length 78.7951
AH32@Durv to AH32@Ald via AH32 length 77.1011
AH1@AFG/IRN to AH1@JamiRd via AH1 length 76.7270
AH77@Awb to AH77@Puni via AH77 length 76.1823
AH2@Taf to AH2@NokKun via AH2 length 75.2716
AH4@Tas|CHN-XJ to AH4@CHN/PAK via AH4 length 74.9304
AH4@Alt to AH4@Ton via AH4 length 74.4814
AH3@Air to AH3@Sai_N via AH3 length 73.6239
AH51@Dar to AH51@ZhobWanaRd via AH51 length 73.4893
G5012@S2/S20 to G65/G5012 via G5012 length 72.1187
G56_E/G76_E to G56(621)/G4215 via G56 length 72.0961
BC37@NinPP to BC37/BC37A via BC37 length 72.0237
AH42@GonExpy&G6Hai@G0613&G0613@G6 to AH42/G6Hai@G109_Das via AH42,G6Hai length 71.5764
AH1@FarRd to AH1/AH71 via AH1 length 71.0943
G35@HuaRd to G35/G72 via G35 length 70.5915
BC37@CasRd to BC37@BouSt via BC37 length 70.3705
AH70@R36_W to AH70@ToR44 via AH70 length 70.0952
AH6@X904 to AH6@Bay_W via AH6 length 69.4362
AH71@Kha_N to AH71@FarRd via AH71 length 69.2148
G42@S312_Wudu to G42@HB/CQ via G42 length 68.9330
E6Kir@Rv92_E&Rv92@E6_E to E6Kir@E75_S&E75@E6_W via E6Kir length 68.2212
AH2@NokKun to AH2@Yak via AH2 length 68.1582
G3012Yar@G315_YenS to G3012Yar@SanExpy via G3012Yar length 66.6719
M41@Karo to M41@Ran via M41 length 66.6389
NT3@ChanLakeTP to NT3@MosCrkTr via NT3 length 65.7823
AH2@R82_N&AH70@R82 to AH2@Anar_W&AH70@Anar via AH2,AH70 length 64.9629
NT1@WalCrkTr to NT1/NT3 via NT1 length 64.0154

I don't know about the others, but the ones for NT, and at least one of the three for BC, there really are no intersections with named roads (or even named hiking trails, as with the two NT entries) for those segments of Arctic highways.

Offline Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2856
  • Last Login:Today at 08:50:39 am
Re: Project Statistics
« Reply #34 on: August 08, 2016, 05:28:39 pm »
I don't know about the others, but the ones for NT, and at least one of the three for BC, there really are no intersections with named roads (or even named hiking trails, as with the two NT entries) for those segments of Arctic highways.

That was my assumption.  I have no problem with these long stretches existing where they make sense.

Offline Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2856
  • Last Login:Today at 08:50:39 am
Re: Project Statistics
« Reply #35 on: December 21, 2016, 12:19:29 pm »
We are under 25 commits to the HighwayData repository from reaching 10,000.  I hope the 10,000th will be a good one!

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4863
  • Last Login:Today at 12:15:33 pm
Re: Project Statistics
« Reply #36 on: December 21, 2016, 12:43:46 pm »
I hope the 10,000th will be a good one!

How many commits out of 9,975 have been bad? ;)

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Project Statistics
« Reply #37 on: December 21, 2016, 02:19:31 pm »
How many commits out of 9,975 have been bad? ;)
I know I've done at least a couple that made zero changes to zero files...
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2856
  • Last Login:Today at 08:50:39 am
Re: Project Statistics
« Reply #38 on: January 31, 2017, 10:16:50 pm »
Two new users submitted files today, making tonight's site update the first that will ingest list files from 150 users.

Offline Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2856
  • Last Login:Today at 08:50:39 am
Re: Project Statistics
« Reply #39 on: February 24, 2017, 11:59:39 pm »
We have passed 900,000 miles of active+preview routes.  Well done all!  How long before we can get to 1 million?

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4863
  • Last Login:Today at 12:15:33 pm
Re: Project Statistics
« Reply #40 on: February 25, 2017, 03:10:14 am »
It took almost 8 months from the 800,000 miles to the 900,000 miles milestone. I guess we might reach 1m by the end of the year.

btw: both milestones were "caused" by me :D

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 30, 2024, 09:39:17 am
  • I like C++
Re: Project Statistics
« Reply #41 on: February 28, 2017, 01:31:58 am »
I'm almost tempted to say we're at one Irv, but nay... it would be nice to call an Irv a nice round number, but it isn't a constant unit of measure. Rather, one Irv is the number of miles on Irv Gordon's 1966 1800S. Which is somewhere over 3 million. Once TM has more mileage than Irv -- now THAT will be a milestone!
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2856
  • Last Login:Today at 08:50:39 am
Re: Project Statistics
« Reply #42 on: May 30, 2017, 10:53:20 pm »
We've exceeded 20,000 routes in active systems.

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4863
  • Last Login:Today at 12:15:33 pm
Re: Project Statistics
« Reply #43 on: June 17, 2017, 06:40:03 am »
We've exceeded 30,000 routes in active+preview systems.

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4863
  • Last Login:Today at 12:15:33 pm
Re: Project Statistics
« Reply #44 on: June 18, 2017, 02:49:03 am »
We have 7 travelers with more than 100,000mi in active+preview now. Congrats to froggie :)

The candidates to join the club next are okroads, mapmikey and mefailenglish which have a little bit more than 90,000mi now.

I'll only exceed 50,000mi soon.