I am working on recentering and checking points along PA 18. I get to Rochester and see the following posted:
PA 18 NB follows Rhode Island Ave, Brighton Ave, Madison St, and Delaware Ave to PA 65 NB.
PA 18 SB follows PA 65 SB all the way to the ramp to Pleasant St and to head back to Rhode Island Ave.
I am really unsure how to best handle this one due to potential missing points anyway. I will almost certainly be editing PA 65, PA 51, and/or PA 68's file whatever I do.
EDIT: I see yakra did something in November 2016; however, I do not think this fully solved the issue. Most specifically, I believe we are missing a point for PA 68.
I could treat this similar to doing one-way streets with having a point for PA 68 between PA 65 and PA 18. I may then relabel the point at the roundabout on PA 68, and then ultimately start the PA 65/PA 18 concurrency where PA 18 NB merges onto PA 65 NB from Delaware Ave.
EDIT 2: Even though PA 18 SB is not posted on PA 18 NB's routing at the interchange with PA 65, there are enough
PA 18 SB shields in Rochester on PA 18 NB's routing to justify me just using that. There will be an edit for PA 68 to line it up with PA 18 at the roundabout.