Author Topic: PA: US 219 Freeway Opening Meyersdale to Somerset  (Read 24007 times)

0 Members and 3 Guests are viewing this topic.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 07:09:34 am
PA: US 219 Freeway Opening Meyersdale to Somerset
« on: October 24, 2018, 08:59:13 pm »
https://www.penndot.gov/regionaloffices/district-9/pages/details.aspx?newsid=614

Posting this as a reminder that it should be open around 11/19/2018.

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4849
  • Last Login:Today at 12:52:03 pm
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #1 on: October 25, 2018, 01:11:28 pm »
It's just a month ahead. Isn't this board for 6-month+?

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #2 on: October 25, 2018, 01:35:18 pm »
In name only. Since the CHM days, that's just been intended as ballpark, never a hard figure.
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline Jim

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 2856
  • Last Login:Today at 03:19:38 pm
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #3 on: October 25, 2018, 02:41:43 pm »
I always interpreted it from the CHM days, correctly or not, I don't know, as a place to post things that need attention in the next six months or a bit longer, hence the +.

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 07:09:34 am
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #4 on: October 25, 2018, 04:58:51 pm »
The description does state within the next six months or so.

Quote
Post highway system changes expected to be implemented in the next 6 months or so.

Otherwise I do not know what will happen to the current US 219 when the freeway opens.

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4849
  • Last Login:Today at 12:52:03 pm
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #5 on: October 26, 2018, 10:43:15 am »
place to post things that need attention in the next six months or a bit longer, hence the +.

The same applies to issues regarding openings / changes happened where we are just not sure how the old road is signed now. However, they are posted in "Report errors and changes to be made immediately to the highway data." board. I think it's currently more than 50% of the open issues there...

However, it's fine to me. Never mind!

Offline rickmastfan67

  • TM Collaborator (A)
  • Hero Member
  • *****
  • Posts: 2064
  • Gender: Male
  • Last Login:Yesterday at 11:42:03 pm
PA: US-219 Meyersdale to Somerset
« Reply #6 on: November 20, 2018, 09:46:43 pm »
The brand new expressway will be opening tomorrow (November 21, 2018).  No idea what will happen numbering wise with the old road.
https://wjactv.com/news/local/drone-video-of-us-219-before-it-opens-to-traffic-wednesday-afternoon
« Last Edit: November 20, 2018, 09:48:49 pm by rickmastfan67 »

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 07:09:34 am
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #7 on: November 21, 2018, 10:56:31 am »
The brand new expressway will be opening tomorrow (November 21, 2018).  No idea what will happen numbering wise with the old road.
https://wjactv.com/news/local/drone-video-of-us-219-before-it-opens-to-traffic-wednesday-afternoon

Yeah I never found any information on the old route.  I will probably put a file with those points somewhere in case something turns up.

Hopefully this will be completed in the HB sometime next week as I recenter all of US 219.  I doubt many of us will be begging for this to be done right away unlike the I-95 changes a couple months ago.

Offline mapcat

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1767
  • Last Login:Today at 12:05:27 pm
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #8 on: November 21, 2018, 09:50:47 pm »
If no one else beats me to it, I can check out the numbering for the old route early next month.
Clinched:

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 07:09:34 am
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #9 on: November 21, 2018, 11:28:54 pm »
If no one else beats me to it, I can check out the numbering for the old route early next month.

I doubt I will make it down there any time soon.  US 219 is not currently high up on my clinching priority list.

Offline Wadsteckel

  • Newbie
  • *
  • Posts: 23
  • Last Login:September 01, 2024, 09:05:19 pm
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #10 on: November 22, 2018, 10:39:41 pm »
I'll be driving the new roadway when I head back out on the road.  Had a load that I picked up in Thomson GA that is bound for Grantsville MD.  With the holiday, I parked at our yard in Warrendale PA, so that means I'll take the PA Turnpike out to Somerset, then down US 219 to the Pilot on Sunday to be ready for the delivery on Monday.  I'll try to get information (which, as a truck driver, I can't really do more than the route I'm on) and post it via my iPad once I'm parked.

-Ed S

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 07:09:34 am
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #11 on: November 24, 2018, 04:24:02 pm »
https://github.com/TravelMapping/HighwayData/pull/2386

I won't mark this as solved due to the uncertainty over any routing changes on the old US 219.
« Last Edit: November 24, 2018, 04:32:28 pm by Markkos1992 »

Offline cl94

  • TM Collaborator
  • Sr. Member
  • *****
  • Posts: 264
  • Gender: Male
  • Last Login:Yesterday at 09:38:08 pm
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #12 on: November 24, 2018, 07:06:35 pm »
I can confirm that the new expressway is open. Old route is not signed as anything from now-current 219, but that doesn't mean anything with how inconsistent PennDOT is.

Offline Wadsteckel

  • Newbie
  • *
  • Posts: 23
  • Last Login:September 01, 2024, 09:05:19 pm
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #13 on: November 25, 2018, 01:06:13 pm »
Parked in Grantsville MD, here’s what I can confirm...

Berlin Plank Rd (which starts at PA31) is still unsigned.  Once on the new US219, there is only one additional exit for Berlin and Rockwood (East Mud Pike) about 3 miles south of where US219 used to divert onto Berlin Plank Rd.  Mile post is 24, but no exit numbers are on the exits. 

Certainly made for an easier drive with 75,000 lbs 😀

Regards,
-Ed S
« Last Edit: November 25, 2018, 01:15:24 pm by Wadsteckel »

Online oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1584
  • Last Login:Today at 05:24:10 pm
    • Hot Springs and Highways pages
Re: PA: US 219 Freeway Opening Meyersdale to Somerset
« Reply #14 on: November 26, 2018, 07:09:13 pm »
Today I both drove the new US 219 segment southbound, and went back northbound to re-drive the bypassed old alignment. No route numbers for the old alignment shown on the Berlin Plank Rd. exit SB, or the US219BusMey_N exit either SB or NB. Moreover, there is no new route number signed on the NB old alignment, just a lot of remnant old US 219 signage (both route markers and reference markers).

Since the new segment opened just a few days ago, and there was some uncertainty when it would open (it opened two days later than scheduled), no surprise that no signage changes were done right after a long holiday weekend. Maybe later.

One thing that would make sense for part of old US 219 would be to extend PA 653 southeast of Garrett, to connect to the new US 219 alignment.
« Last Edit: November 26, 2018, 10:34:07 pm by oscar »