DEU-NI: L5 Bensersiel bypass
« on: July 22, 2023, 10:06:29 am »
The bypass was built from 2009 to 2011. It was closed in June 2017 because the construction was illegal. It is routed through a protected bird sanctuary. After legal issues had been fixed, the road was reopened in March 2021. The bypass was not dedicated as state route when I drafted the system. Meanwhile, nwsib confirms that the bypass is L5 now.

https://www.sueddeutsche.de/politik/kommunen-esens-umstrittene-umgehungsstrasse-wieder-fuer-verkehr-frei-dpa.urn-newsml-dpa-com-20090101-210315-99-826241

There is only one affected user: bhemphill