For US3, we still need to confirm:
• the final SB exit, at I-95
• the NB-only exit right before the NH line
Since US3 still uses old CHM-style named labels anyway, I'll defer converting it until I-95 is done, and then take care of everything at once including the new 50B(95) & 51(95) labels.