Author Topic: Texas outlook  (Read 47088 times)

0 Members and 1 Guest are viewing this topic.

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: Texas outlook
« Reply #15 on: March 13, 2021, 11:48:18 am »
I saw that the SM Wright is supposed to also become an extenstion of TX 310 at some point when the boulevard is complete.

There is a new shield sign assembly at the signal where the WB off-ramp from WB US 175 meets S.M. Wright.  It shows both SB and NB TX 310; I thought sure the TX 310 part of S.M. Wright would only be south of US 175.  The S.M. Wright exit from SB I-45 has new BGSes listing S.M. Wright but no numbered routes.
I was also under the impression, though not 100% certain, that 310 would remain only S of 175. Can't remember when/where/how I got that idea into my head.

The original agreement was to extend 310 north back to 45.


Watchlist

Waiting for signage to catch up
ItemImagery    Retrieved
TX114BusGra deletedMar 20202020-09-25 Fri
TXSpr419 deletedMar 20192020-10-03 Sat
I-69 exit numbersSep 20192020-10-28 Wed
US79BusTay deletedMar 20202020-11-09 Mon
US175BusPoy?2020-11-09 Mon
US 62/85 realigned in El Paso
TX34BusTer is dead; long live TxSpr226    Jan 20192020-11-19 Thu
TX7/21, NacogdochesDec 20182020-11-26 Thu
FM1774BusMag exists & is signed?Oct 20192020-12-07 Mon
TXSpr33 deletedNov 20182020-12-28 Mon
I-14 / US190 exit numbers...2020-12-29 Tue
FM75 trunc SJun 20182021-01-29 Fri
FM2551 trunc SDec 20182021-02-28 Sun
TXLp332 deletedMar 20192021-03-21 Sun
FM437Spr signage unconfirmedJul 20112021-04-18 Thu
SS 376 & 377Oct 20192021-04-22 Thu
FM3541 -> FM2185old!2021-04-28 Wed
TXSpr379Mar 20202021-05-05 Wed
FM487 discontinuousJun 20192021-05-26 Wed
TX310 ext. N?2021-05-26 Wed

2020
12 11: TX31 Corsicana relief route segment 1
End of 2020: TX105 Brazos River bridge

2021
3/15: TX249 Section 1B
Spring: TX365 out to bid
Summer: Collin County Outer Loop
Summer: TX105 Brazos River bridge
Late: RM620SprAus
2021: I-30 / TX360 interchange


2022
Feb: US83 La Joya bypass phase I (W of FM2221)
March: TX31 Corsicana relief route segment 2
April: Driscoll bypass
Spring: TX31 Corsicana relief route
Spring: TX99 Segments H and I-1
Spring: resubmit FM1488 Magnolia Relief Route
Mid-2022: US62/180 fwy conversion, El Paso
Summer: US377 Cresson bypass
Summer: I-35E / US67 Southern Gateway Project
2022: SH 249 - Todd Mission to Navasota
2022: US69 Zavalla, US59 Nacogdoches
2022: TX99 Segment I-2
FY2022: DalNorTlwy to FM428
Late: FBPTollRd 1mi extension

2023
Early: US281 north
Spring: TX249 Section 2
May: US83 La Joya bypass phase II (E of FM2221)
2023: https://harborbridgeproject.com/
Late: TXLp335 relocation

2024
Fall: TXLp1853 begins construction

2025
Diboll Relief Route

2025-2026
Oak Hill Pkwy

Waiting for OSM/imagery to catch up
Fall 2019: Ric Williamson Memorial Hwy & US180

Vaporways?
TxDOT Highway Designations changes (shapefiles)
TX276 Quinlan relocation
TX68 is far far off in the future.
FM121SprGra
TXLp88


Exit numbers
US59   eventually convert to I-69(###)
US69   see US59 & US75
US75   3 numbering schemes, 2 nonsensical
US190/I-14   (wait for GMSV to catch up)
US54ElP   ULRS
US82   ULRS



AASHTO SCOH USRN May 2012
US377 Cresson bypass / business (near TX171)

AASHTO SCOH USRN Spring 2019 (wait for signage to catch up)
US79BusTay deleted
US 62/85 realigned in El Paso
US175BusPoy
« Last Edit: January 16, 2022, 08:56:12 pm by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: Texas outlook
« Reply #16 on: April 18, 2021, 11:55:20 am »
TxDOT plans for traffic to be shifted onto the new roadbed at the end of February.
The Bryan TxDOT office has announced traffic will move to new bridges over the Brazos and Navasota rivers and Coles Creek at the end of February.

Haven't seen anything more recent.
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: Texas outlook
« Reply #17 on: May 26, 2021, 12:07:10 pm »
https://kwhi.com/txdot-now-expecting-new-highway-105-bridges-to-open-to-traffic-in-summer/

Quote
Completion of the Highway 105 bridge project between Brenham and Navasota is taking TxDOT longer than anticipated.
You don't say...

Quote
TxDOT now expects that traffic shift to take place this summer.

Once the bridge deck construction is finished, the bridge rail will be completed and the roadway will be ready to open for traffic.  After traffic is moved to the new road, TxDOT’s contractor, James Construction Group, will complete the new FM 159 tie-in and demolish the old roadway.


Watchlist

Waiting for signage to catch up
ItemImagery    Retrieved
TX114BusGra deletedMar 20202021-05-26 Wed
TXSpr419 deletedMar 20192021-05-26 Wed
I-69 exit numbersSep 20192020-10-28 Wed
US79BusTay deletedMar 20202020-11-09 Mon
US175BusPoy?2020-11-09 Mon
US 62/85 realigned in El Paso
TX34BusTer is dead; long live TxSpr226    Jan 20192020-11-19 Thu
TX7/21, NacogdochesDec 20182020-11-26 Thu
FM1774BusMag exists & is signed?Oct 20192020-12-07 Mon
TXSpr33 deletedNov 20182020-12-28 Mon
I-14 / US190 exit numbers...2020-12-29 Tue
FM75 trunc SJun 20182021-01-29 Fri
FM2551 trunc SDec 20182021-02-28 Sun
TXLp332 deletedMar 20192021-03-21 Sun
FM437Spr signage unconfirmedJul 20112021-04-18 Thu
SS 376 & 377Oct 20192021-04-22 Thu
FM3541 -> FM2185old!2021-04-28 Wed
TXSpr379Mar 20202021-05-05 Wed
FM487 discontinuousJun 20192021-05-26 Wed
TX310 ext. N?2021-05-26 Wed

2020
12 11: TX31 Corsicana relief route segment 1

2021
Spring: TX365 out to bid
Summer: Collin County Outer Loop
Summer: TX105 Brazos River bridge
Late: RM620SprAus
2021: I-30 / TX360 interchange


2022
Feb: US83 La Joya bypass phase I (W of FM2221)
March: TX31 Corsicana relief route segment 2
April: Driscoll bypass
Spring: TX31 Corsicana relief route
Spring: TX99 Segments H and I-1
Mid-2022: US62/180 fwy conversion, El Paso
Summer: US377 Cresson bypass
2022: SH 249 - Todd Mission to Navasota
2022: US69 Zavalla, US59 Nacogdoches
2022: TX99 Segment I-2
FY2022: DalNorTlwy to FM428
Late: FBPTollRd 1mi extension

2023
Early: US281 north
Spring: TX249 Section 2
May: US83 La Joya bypass phase II (E of FM2221)
2023: https://harborbridgeproject.com/
Late: TXLp335 relocation

2024
Fall: TXLp1853 begins construction

2025
Diboll Relief Route

2025-2026
Oak Hill Pkwy

Vaporways?
TxDOT Highway Designations changes (shapefiles)
TX276 Quinlan relocation
TX68 is far far off in the future.
FM1488 relocation, Magnolia
FM121SprGra
TXLp88


Exit numbers
US59   eventually convert to I-69(###)
US69   see US59 & US75
US75   3 numbering schemes, 2 nonsensical
US190/I-14   (wait for GMSV to catch up)
US54ElP   ULRS
US82   ULRS



AASHTO SCOH USRN May 2012
US377 Cresson bypass / business (near TX171)

AASHTO SCOH USRN Spring 2019 (wait for signage to catch up)
US79BusTay deleted
US 62/85 realigned in El Paso
US175BusPoy
« Last Edit: May 26, 2021, 03:09:45 pm by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: Texas outlook
« Reply #18 on: May 29, 2021, 08:21:46 pm »
Done
https://github.com/TravelMapping/HighwayData/pull/4834
TXLp235 -> TXSpr235
TX34BusTer is dead; long live TxSpr226
US175BusPoy reinstated


Watchlist

Waiting for signage to catch up
ItemImagery    Retrieved
TX114BusGra deletedMar 20202021-05-26 Wed
TXSpr419 deletedMar 20192021-05-26 Wed
I-69 exit numbersJan 20202021-06-06 Sun
US79BusTay deletedMar 20202020-11-09 Mon
US 62/85 realigned in El Paso
TX7/21, NacogdochesDec 20182020-11-26 Thu
FM1774BusMag exists & is signed?Oct 20192020-12-07 Mon
TXSpr33 deletedNov 20182020-12-28 Mon
I-14 / US190 exit numbers...2020-12-29 Tue
FM75 trunc SJun 20182021-01-29 Fri
FM2551 trunc SDec 20182021-02-28 Sun
TXLp332 deletedMar 20192021-03-21 Sun
FM339SprMtC signage unconfirmedold2021-06-05 Thu
FM437Spr signage unconfirmedJul 20112021-04-18 Thu
SS 376 & 377Oct 20192021-04-22 Thu
FM3541 -> FM2185old!2021-04-28 Wed
TXSpr379Mar 20202021-05-05 Wed
FM487 discontinuousJun 20192021-05-26 Wed
TX310 ext. N?2021-05-26 Wed

2020
12 11: TX31 Corsicana relief route segment 1

2021
Spring: TX365 out to bid
Summer: Collin County Outer Loop
Summer: TX105 Brazos River bridge
Late: RM620SprAus
2021: I-30 / TX360 interchange


2022
Feb: US83 La Joya bypass phase I (W of FM2221)
March: TX31 Corsicana relief route segment 2
April: Driscoll bypass
Spring: TX31 Corsicana relief route
Spring: TX99 Segments H and I-1
Mid-2022: US62/180 fwy conversion, El Paso
Summer: US377 Cresson bypass
2022: SH 249 - Todd Mission to Navasota
2022: US69 Zavalla, US59 Nacogdoches
2022: TX99 Segment I-2
FY2022: DalNorTlwy to FM428
Late: FBPTollRd 1mi extension

2023
Early: US281 north
Spring: TX249 Section 2
May: US83 La Joya bypass phase II (E of FM2221)
2023: https://harborbridgeproject.com/
Late: TXLp335 relocation

2024
Fall: TXLp1853 begins construction

2025
Diboll Relief Route

2025-2026
Oak Hill Pkwy

Vaporways?
TxDOT Highway Designations changes (shapefiles)
TX276 Quinlan relocation
TX68 is far far off in the future.
FM1488 relocation, Magnolia
FM121SprGra
TXLp88


Exit numbers
US59   eventually convert to I-69(###)
US69   see US59 & US75
US75   3 numbering schemes, 2 nonsensical
US190/I-14   (wait for GMSV to catch up)
US54ElP   ULRS
US82   ULRS



AASHTO SCOH USRN May 2012
US377 Cresson bypass / business (near TX171)

AASHTO SCOH USRN Spring 2019 (wait for signage to catch up)
US79BusTay deleted
US 62/85 realigned in El Paso
« Last Edit: June 06, 2021, 03:04:25 pm by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 07:29:54 am
Re: Texas outlook
« Reply #19 on: June 01, 2021, 10:59:46 am »

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: Texas outlook
« Reply #20 on: June 02, 2021, 06:02:21 pm »
Something else to keep an eye on: https://www.aaroads.com/forum/index.php?topic=3624.msg2620946#msg2620946
I have been watching this AARoads thread closely. I've posted in it, and am notified when it's updated.
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 07:29:54 am
Re: Texas outlook
« Reply #21 on: July 07, 2021, 01:36:34 pm »
Something else to keep an eye on: https://www.aaroads.com/forum/index.php?topic=3624.msg2620946#msg2620946
I have been watching this AARoads thread closely. I've posted in it, and am notified when it's updated.

Looking at the latest update in the thread, I do not think that you need to do anything related to I-69E.  It is a really odd scenario...

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: Texas outlook
« Reply #22 on: July 11, 2021, 02:12:33 pm »
Done
I-69 exit numbers
TXSpr33 deleted / FM2551 trunc S
US79BusTay deleted


Watchlist

Waiting for signage to catch up
ItemImagery    Retrieved
TX114BusGra deletedMar 20202021-05-26 Wed
TXSpr419 deletedMar 20192021-05-26 Wed
US 62/85 realigned in El PasoApr 20212021-07-11 Sun
TX7/21, NacogdochesDec 20182021-07-21 Wed
FM1774BusMag exists & is signed?Oct 20192021-07-30 Fri
I-14 / US190 exit numbersApr 20212021-08-08 Sun
FM75 trunc SFeb 20212021-08-08 Sun
TXLp332 deletedMar 20212021-08-08 Sun
FM339SprMtC signage unconfirmedJul 20082021-08-31 Tue
SS 376 & 377Oct 20192021-08-31 Tue
FM3541 -> FM2185May 20092021-09-05 Wed
TXSpr379Mar 20202021-05-05 Wed
FM487 discontinuousJun 20192021-05-26 Wed
TX310 ext. N?2021-05-26 Wed

2020
12 11: TX31 Corsicana relief route segment 1

2021
Spring: TX365 out to bid
Summer: Collin County Outer Loop
Summer: TX105 Brazos River bridge
Late: RM620SprAus
2021: I-30 / TX360 interchange


2022
Feb: US83 La Joya bypass phase I (W of FM2221)
March: TX31 Corsicana relief route segment 2
April: Driscoll bypass
Spring: TX31 Corsicana relief route
Spring: TX99 Segments H and I-1
Mid-2022: US62/180 fwy conversion, El Paso
Summer: US377 Cresson bypass
Fall: TXLp335 Segment B-2 Phase 2
2022: SH 249 - Todd Mission to Navasota
2022: US69 Zavalla, US59 Nacogdoches
2022: TX99 Segment I-2
FY2022: DalNorTlwy to FM428
Late: FBPTollRd 1mi extension

2023
Early: US281 north (San Antonio)
Spring: TX249 Section 2
May: US83 La Joya bypass phase II (E of FM2221)
June: US281 Premont
2023: https://harborbridgeproject.com/
2023: FBPTollRd Extension to Sienna Ranch Road
Fall: TX TXLp1604 I-10(587)_N FM78
Late: TXLp335 Segment B-1 Phase 2

2024
Early: Rogers bypass
Fall: TXLp1853 begins construction

2025
Diboll Relief Route

2025-2026
Oak Hill Pkwy

2026
FM1171 W ext ready to let

Vaporways?
TxDOT Highway Designations changes (shapefiles)
TX276 Quinlan relocation
TX68 is far far off in the future.
FM1488 relocation, Magnolia
FM121SprGra
TXLp88
US290 Fredericksburg relief route


Exit numbers
US59   eventually convert to I-69(###)
US69   see US59 & US75
US75   3 numbering schemes, 2 nonsensical
US190/I-14   (wait for GMSV to catch up)
US54ElP   ULRS
US82   ULRS



AASHTO SCOH USRN May 2012
US377 Cresson bypass / business (near TX171)

AASHTO SCOH USRN Spring 2019 (wait for signage to catch up)
US 62/85 realigned in El Paso
« Last Edit: September 11, 2021, 10:32:01 am by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: Texas outlook
« Reply #23 on: September 11, 2021, 10:38:34 am »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: Texas outlook
« Reply #24 on: September 15, 2021, 01:34:46 pm »
Done
TX105, Brazos River
TX31 Corsicana relief route
TX7/21, Nacogdoches


Watchlist

Waiting for signage to catch up
ItemImagery    Retrieved
TX114BusGra deletedMar 20202021-10-23 Sat
TXSpr419 deletedApr 20212021-10-23 Sat
TX289 @ CCOutLpMar 20212021-10-23 Sat
US 62/85 realigned in El PasoApr 20212021-10-30 Sun
N end of I-69ESep 20192021-10-30 Sun
FM1774BusMag exists & is signed?Apr 20212021-11-19 Fri
I-14 / US190 exit numbersApr 20212021-11-26 Fri
FM75 trunc SFeb 20212021-08-08 Sun
TXLp332 deletedMar 20212021-08-08 Sun
FM339SprMtC signage unconfirmedJul 20082021-08-31 Tue
SS 376 & 377Oct 20192021-08-31 Tue
FM3541 -> FM2185May 20092021-09-05 Wed
TXSpr379Apr 20212021-09-15 Wed
FM487 discontinuousMar 20212021-10-14 Wed
TX310 ext. N?2021-10-14 Wed

2021
November: FM1409 extension, and segment S of I-10. But what about the bridge connecting them?
2021: I-30 / TX360 interchange

2022
Feb: US83 La Joya bypass phase I (W of FM2221)
Early (1,2): RM620SprAus
April: Driscoll bypass
5-1 (1,2,3): TX365 contract
Spring: TX99 Segments H and I-1
Spring: TXLp335 Segment B-2 Phase 2
Spring: resubmit FM1488 Magnolia Relief Route
Mid-2022: US62/180 fwy conversion, El Paso
Mid-2022: TX211
Summer: US377 Cresson bypass
Summer: TXLp250 mainlanes
Summer: I-35E / US67 Southern Gateway Project
Summer: TXSpr399 alignment recommendation
Fall: TXLp335 Segment B-2 Phase 2
2022: SH 249 - Todd Mission to Navasota
2022: US69 Zavalla, US59 Nacogdoches
2022: TX99 Segment I-2
FY2022: DalNorTlwy to FM428
Late: FBPTollRd 1mi extension
December: FM2478 realignment @ FM1461

2023
Jan: Hutto bypass / SE Loop
Early: US281 north (San Antonio)
Spring: TX249 Section 2
May: US83 La Joya bypass phase II (E of FM2221)
June Sept: US281 Premont
2023: https://harborbridgeproject.com/
2023: FBPTollRd Extension to Sienna Ranch Road
Fall: TX TXLp1604 I-10(587)_N FM78
Late: TXLp335 Segment B-1 Phase 2

2024
Early: Rogers bypass
Fall: TXLp1853 begins construction
2024: FM1385 realignments

2025
Diboll Relief Route

2025-2026
Oak Hill Pkwy

2026
FM1171 W ext ready to let

2027
FTW SE Connector (I-820 30A closed)

When?
FM396 grade separations & mainlanes
Collin County Outer Loop, TX289 & FM2478
https://www.loop360project.com/

Vaporways?
TxDOT Highway Designations changes (shapefiles)
TX276 Quinlan relocation
TX68 is far far off in the future.
FM121SprGra
TXLp88
US290 Fredericksburg relief route
FM2611 bridge over San Bernard River


Exit numbers
US59   eventually convert to I-69(###)
US69   see US59 & US75
US75   3 numbering schemes, 2 nonsensical
US190/I-14   (wait for GMSV to catch up)
US54ElP   ULRS
US82   ULRS



AASHTO SCOH USRN Spring 2012
US377 Cresson bypass / business (near TX171)

AASHTO SCOH USRN Spring 2016
US83 La Joya-Piñetas bypass / business

AASHTO SCOH USRN Spring 2019 (wait for signage to catch up)
US 62/85 realigned in El Paso
« Last Edit: December 05, 2021, 10:20:22 am by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 07:29:54 am
Re: Texas outlook
« Reply #25 on: December 06, 2021, 02:07:06 pm »

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: Texas outlook
« Reply #26 on: December 06, 2021, 07:46:09 pm »
Thanks. I've been keeping my eye on progress north of there, where there's more recent imagery but TX310 signage hasn't really started to solidify yet.
A couple examples
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: Texas outlook
« Reply #27 on: December 18, 2021, 10:11:25 pm »
Done
#5487 TXSpr376 & TXSpr377
#5519 TXSpr379
#5579 FM1409 ext & FM1409Cov
#5890 US69 Zavalla
#5893 I-69W exit numbers
#6118 TX249 Section 2 / FM2478 realignment @ FM1461
#6184 TX211


Watchlist

Waiting for signage to catch up
ItemImagery    Retrieved
TX114BusGra deletedJul 20222023-02-26 Sun
TXSpr419 deletedMay 20222022-09-20 Tue
TX289 @ CCOutLpMar 20212022-09-20 Tue
US 62/85 realigned in El PasoApr 20212022-10-01 Sat
FM1774BusMag exists & is signed?Apr 20222022-10-30 Sun
I-14 / US190 exit numbersJul 20222022-11-25 Fri
FM75 trunc SDec 20212022-12-02 Fri
TXLp332 deletedJul 20222022-12-19 Mon
FM339SprMtC signage unconfirmedJul 20082022-12-30 Fri
FM3541 -> FM2185May 20092023-01-10 Tue
FM487 discontinuousMay 20222023-01-28 Sat
TX310 ext. N?2022-09-08 Thu

2021
2021: I-30 / TX360 interchange

2022
US 59 “County Rd/Hill St” interchange in Victoria
Early (1,2): RM620SprAus
Spring: TXLp335 Segment B-2 Phase 2
Spring: resubmit FM1488 Magnolia Relief Route
Mid-2022: US62/180 fwy conversion, El Paso
8/2: Driscoll bypass
8/3: TX276 Quinlan relocation
Summer: I-35E / US67 Southern Gateway Project
Fall: TXLp335 Segment B-2 Phase 2
Fall: Collin County Outer Loop, TX289 to FM2478
Fall (1,2): FM121SprGra
Oct: TX36 widening, Pleak to West Columbia
FY2022: DalNorTlwy to FM428

2023
Early: TX146 Kemah/Clear Lake Bridge & Freeway Project
Jan: Hutto bypass / SE Loop
Early: US281 north (San Antonio)
Spring/May: US59 Nacogdoches
Spring: US83 La Joya relief route
6/7: Exit numbers? TX I-14 PadHamRd FM2410_E (topic)
6/30: Exit numbers? TX I-14 FM2410_E I-35
Summer: US59 / TXLp224
Summer: FBPTollRd Extension to Sienna Ranch Road
June Sept: US281 Premont
2023: Dallas Pkwy to Grayson county line
Fall: TX TXLp1604 I-10(587)_N FM78
Fall: Begin TXLp195 Construction Phase I
Late: TXLp335 Segment B-1 Phase 2
Late: US377 Cresson bypass
Late: FM2100 construction starts (or early 2024)

2024
Early: Rogers bypass
Spring: FM110
9/27 recenter TX36 / TXSpr10_S
Mid-to-late+: https://harborbridgeproject.com/
Fall: TXLp1853 begins construction
2024: FM1385 realignments

2025
Summer: Seminole Relief Route, begin construction
TXLp390 extension, Marshall, anticipated construction
Diboll Relief Route
FM973 bypass/business, Manor
Alvin Freeway, begin construction

2025-2026
Oak Hill Pkwy

2026
Apr: Hardy Downtown Connector
2026: FM1171 W ext ready to let
365

2027
2027: FTW SE Connector (I-820 30A closed)

2028
2028: construction start of the US 380 McKinney bypass
12/29: Corrigan relief route

Later
2029: Refugio Relief Route
2031: TXLp88 Segment 3
2032: TXSpr399 construction starts
2035: TXLp88 Segment 2
2040-2045: TXLp88 Segments 1 & 4 / US84 & US84BusLub

When?
FM1409 bridge over I-10
FM396 grade separations & mainlanes
https://www.loop360project.com/
US277 NE of San Angelo

Vaporways?
TxDOT Highway Designations changes (shapefiles)
US290 Fredericksburg relief route
TX32
TX68
TXLp480 Segment 3 tabled as of 2020
FM2611 bridge over San Bernard River
San Angelo Relief Route


Exit numbers
US59   eventually convert to I-69(###)
US69   see US59 & US75
US75   3 numbering schemes, 2 nonsensical
US190/I-14   (wait for GMSV to catch up)
US54ElP   ULRS
US82   ULRS



AASHTO SCOH USRN Spring 2012
US377 Cresson bypass / business (near TX171)

AASHTO SCOH USRN Spring 2016
US83 La Joya-Piñetas bypass / business

AASHTO SCOH USRN Spring 2019 (wait for signage to catch up)
US 62/85 realigned in El Paso
« Last Edit: February 26, 2023, 09:26:26 am by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline yakra

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4422
  • Last Login:November 11, 2024, 12:50:03 pm
  • I like C++
Re: Texas outlook
« Reply #28 on: March 09, 2023, 09:28:11 am »
Done
#6447 Quinlan Bypass, Victoria AccRd
#6478: I-35E / US67 Southern Gateway Project
#6563: FM1409 bridge over I-10


Watchlist

Waiting for signage to catch up
ItemImagery    Retrieved
TX114BusGra deletedJul 20222023-02-26 Sun
TXSpr419 deletedMay 20222023-03-09 Thu
FM2478 @ CCOutLpMar 20212023-03-18 Sat
US 62/85 realigned in El PasoApr 20212022-10-01 Sat
FM1774BusMag exists & is signed?Apr 20222022-10-30 Sun
I-14 / US190 exit numbersJul 20222022-11-25 Fri
FM75 trunc SDec 20212022-12-02 Fri
TXLp332 deletedJul 20222022-12-19 Mon
FM339SprMtC signage unconfirmedJul 20082022-12-30 Fri
FM3541 -> FM2185May 20092023-01-10 Tue
FM487 discontinuousMay 20222023-01-28 Sat
TX310 ext. N?2023-02-26 Sun

2021
2021: I-30 / TX360 interchange

2022
Early (1,2): RM620SprAus
Spring: TXLp335 Segment B-2 Phase 2
Mid-2022: US62/180 fwy conversion, El Paso
Fall: TXLp335 Segment B-2 Phase 2
Fall (1,2): FM121SprGra
Oct: TX36 widening, Pleak to West Columbia
FY2022: DalNorTlwy to FM428

2023
Early: TX146 Kemah/Clear Lake Bridge & Freeway Project
Early: US281 north (San Antonio)
Q1: FM1488 Magnolia Relief Route begin engineering and design work
April: Driscoll bypass
Spring/May: US59 Nacogdoches
Spring: US83 La Joya relief route
6/7: Exit numbers? TX I-14 PadHamRd FM2410_E (topic)
6/30: Exit numbers? TX I-14 FM2410_E I-35
Summer: Hutto bypass / SE Loop
Summer: US59 / TXLp224
Summer: FBPTollRd Extension to Sienna Ranch Road
Summer: TXSpr320 Borderland Expy construction begins
June Sept: US281 Premont
2023: Dallas Pkwy to Grayson county line
Fall: TX TXLp1604 I-10(587)_N FM78
Fall: Begin TXLp195 Construction Phase I
Late: TXLp335 Segment B-1 Phase 2
Late: US377 Cresson bypass
Late: FM2100 construction starts (or early 2024)

2024
Early: Rogers bypass
Spring: FM110
9/27 recenter TX36 / TXSpr10_S
Mid-to-late+: https://harborbridgeproject.com/
Fall: TXLp1853 begins construction
2024: FM1385 realignments

2025
Summer: Seminole Relief Route, begin construction
Sept. 25: TX365
TXLp390 extension, Marshall, anticipated construction
Diboll Relief Route
FM973 bypass/business, Manor
Alvin Freeway, begin construction
TXLp9 Segment B
FY 2025-2030: FM2185 extension to/via FM3541

2025-2026
Oak Hill Pkwy

2026
Apr: Hardy Downtown Connector
2026: FM1171 W ext ready to let


2027
2027: FTW SE Connector (I-820 30A closed)

2028
2028: construction start of the US 380 McKinney bypass
12/29: Corrigan relief route

Later
2029: Refugio Relief Route
2031: TXLp88 Segment 3
2032: TXSpr399 construction starts
2035: TXLp88 Segment 2
2040-2045: TXLp88 Segments 1 & 4 / US84 & US84BusLub

When?
TX174 Brazos River bridge
FM396 grade separations & mainlanes
https://www.loop360project.com/
US277 NE of San Angelo

Vaporways?
TxDOT Highway Designations changes (shapefiles)
US290 Fredericksburg relief route
TX32
TX68
TXLp480 Segment 3 tabled as of 2020
FM2611 bridge over San Bernard River
San Angelo Relief Route


Exit numbers
US59   eventually convert to I-69(###)
US69   see US59 & US75
US75   3 numbering schemes, 2 nonsensical
US190/I-14   (wait for GMSV to catch up)
US54ElP   ULRS
US82   ULRS



AASHTO SCOH USRN Spring 2012
US377 Cresson bypass / business (near TX171)

AASHTO SCOH USRN Spring 2016
US83 La Joya-Piñetas bypass / business

AASHTO SCOH USRN Spring 2019 (wait for signage to catch up)
US 62/85 realigned in El Paso
« Last Edit: April 17, 2023, 09:53:02 am by yakra »
Sri Syadasti Syadavaktavya Syadasti Syannasti Syadasti Cavaktavyasca Syadasti Syannasti Syadavatavyasca Syadasti Syannasti Syadavaktavyasca

Offline Markkos1992

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 3301
  • Last Login:Today at 07:29:54 am
Re: Texas outlook
« Reply #29 on: August 26, 2023, 09:14:15 am »
Posting here because I am uncertain that TX 114 TRUCK will continue to be a thing once TX 170 is fully upgraded to a freeway.